Laserfiche WebLink
Pleasanton BART October 9, 2025 <br />Site Re-Use Options Memorandum <br /> <br /> <br />30 <br /> <br />ii. Walnut Creek BART TOD <br /> <br />The first two phases of TOD at Walnut <br />Creek BART station were completed in <br />2022. This development has strong direct <br />diagonal walks to BART and a small open <br />space at the station entry. Once fully <br />complete, the transit village will comprise <br />about 600 market-rate homes and 27,000 <br />sq. ft. of retail. Here the existing BART <br />garage was retained and supplemented <br />with an additional, privately operated <br />garage, while the surface parking area <br />has been redeveloped. <br /> <br />Prior to this development, the site had <br />2,089 BART rider parking spaces. The <br />current number is 1,244, not including the <br />private garage. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Figure 8-6: Aerial view of the Walnut Creek BART TOD. <br /> <br />Figure 8-5: Phase 2 mixed-use residential building and paseo <br />at Walnut Creek transit village.