Laserfiche WebLink
Pleasanton BART October 9, 2025 <br />Site Re-Use Options Memorandum <br /> <br /> <br />31 <br /> <br />iii. North Berkeley BART TOD <br /> <br />This TOD project is in <br />development and is anticipated <br />to break ground in 2026. The <br />TOD will includes 750 homes (of <br />which 52% will be affordable), a <br />small amount of retail space, a <br />childcare center, a bike station, <br />and a large diagonal plaza. <br /> <br />Currently the site has 620 BART <br />rider parking spaces, while the <br />future development will have <br />120 spaces in a wrap-building <br />garage and will retain an <br />additional 80 spaces in an <br />auxiliary lot. <br /> <br /> <br /> <br /> <br />Figure 8-8: North Berkeley BART TOD Siteplan. <br />Figure 8-7: Proposed bike path, drop-offs and station access. <br />Site Area: 7.3 Acres <br />Residential: 750 <br />units, 52% affordable <br />Retail: ~6,500 square <br />feet (including childcare <br />center)