Laserfiche WebLink
Pleasanton BART October 9, 2025 <br />Site Re-Use Options Memorandum <br /> <br /> <br />32 <br /> <br /> <br /> <br /> <br />iv. El Cerrito Plaza BART TOD <br /> <br />The City approved the master plan <br />for this TOD project, and the first <br />building is expected to break <br />ground in November 2025. This <br />development plan includes 743 <br />housing units, a small amount of <br />commercial space (e.g., a café), a <br />bike station, and a library. <br /> <br />Currently the site has 740 BART <br />rider parking spaces, while the <br />future development will have 145 <br />spaces in one level of a podium <br />garage. <br /> <br /> <br /> <br /> <br /> <br /> Figure 8-10: El Cerrito Plaza BART TOD Site plan. <br /> <br />Figure 8-9: Aerial rendering showing the proposed plaza and buildings.