Laserfiche WebLink
Pleasanton BART <br />Existing Physical Site Conditions Opportunities and Constraints Evaluation Oct 16, 2025 <br /> <br /> <br /> <br />18 <br />5. Development Opportunities & Constraints <br /> <br /> <br />a. Development potential of the Site <br />[OPPORTUNITY] <br /> <br />i. High development capacity <br />The site has multiple density thresholds defined by different regulations/stakeholders. <br />Considering typical development densities, it could yield up to 1,200-1,300 new units. <br /> <br />ii. Change in site circulation pattern <br />Based on conversations with BART and City staff and site analysis undertaken thus far, and in <br />keeping with BART’s adopted Station Access Policy and MADG, there is appetite to change the <br />vehicular circulation for this site with respect to the location of drop-offs/pick-ups, bus stops and <br />parking access, with the goal of enhancing the rider experience, increasing pedestrian/bike <br />activity, and reducing the impact of vehicular traffic on the site. However, an accessible drop-off <br />zone that meets Public Right-of-Way Accessibility Guidelines (PROWAG) should be maintained <br />as close to the station entry as needed. There is significant interest and opportunity to improve <br />pedestrian access to and through the site and to the station entry. <br /> <br />iii. Reduction in BART rider parking usage <br />The COVID-19 pandemic severely impacted public transit ridership across the nation. The <br />BART system has been slow to recapture the lost ridership and today has a daily ridership of <br />about half that of the pre-pandemic volumes, although BART has been experiencing a <br />consistent 5% growth in ridership in each of the last two years. <br />This provides an opportunity to plan for reduced BART parking demand as part of any new <br />development. Also, BART staff have expressed the need to consolidate their parking in a single <br />location for ease of access, circulation and management. <br />There is also the potential to explore maximizing significant existing BART parking infrastructure <br />on the Dublin side of the station. Given the site’s location and likelihood that it will continue to be <br />a “drive to” station for many commuters, maintaining some an appropriate number of on-site <br />rider parking is desirable. <br /> <br />iv. Fire access <br />Also, fire department access will be required around any new buildings. Alternatives for fire <br />access, and potential limitations on building heights and/or frontage design due to available LPFD <br />equipment will require consultation with the Livermore-Pleasanton Fire Department (LPFD). <br /> <br />v. Service Vehicle access <br />Site access and circulation will also need to consider the requirements of BART maintenance <br />vehicle and Treasury vehicle access. Maintenance access requirements are laid out in the Basis <br />of Design Criteria memo (section 7.c of this document). <br />The BART Treasury truck enters the station from the Dublin side via DeMarcus Blvd and <br />departs from the Pleasanton side via Owens Dr. While on site, this truck is usually parked in <br />front of the station entrance for servicing (~30 minutes). The Treasure truck services the station <br />three days a week between 7.30-8.00am. <br /> <br /> <br /> <br /> <br />DRA <br />F <br />T