My WebLink
|
Help
|
About
|
Sign Out
Planning Commission Agenda Packet 102225 (1)
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
10-22
>
Planning Commission Agenda Packet 102225 (1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2025 4:35:02 PM
Creation date
12/30/2025 4:30:37 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Pleasanton BART <br />Existing Physical Site Conditions Opportunities and Constraints Evaluation Oct 16, 2025 <br /> <br /> <br /> <br />17 <br />4. BART’s Basis of Design Criteria <br /> <br />The Basis of Design Criteria memo prepared by BART is included the appendix section of this <br />document (Section 7.c.). These criteria are intended to provide the development team selected <br />in the future with information to develop a comprehensive and project specific Basis of Design <br />and Maintenance Responsibility Matrix. This matrix will be submitted and reviewed by BART to <br />communicate how the development intends to address the operational and design needs of the <br />District. This memo is only an initial statement of criteria- a full list of future will result from site <br />specific field and technical investigations. <br /> <br />The memo covers process-related items and includes criteria under the following headings. A <br />summary of notable criteria is listed below: <br /> <br />• Utilities <br />o This section sets out criteria for existing, new and relocated utilities, as well as grading <br />and site lighting. It also references other BART standards and permits for adherence. <br /> <br />• Structural Design for Buildings <br />o This section sets out structural design criteria for any new development and <br />improvements, and references other BART standards, Building and Engineering Codes. <br /> <br />• Station Maintenance and Access <br />o This section provides specific parameters for service and maintenance access to BART <br />facilities on site. A few key ones that will impact the development footprint and site <br />circulation are reiterated below: <br />▪ A clearance of at least 10’ to be maintained around the perimeter of all BART <br />structures (including electrical and irrigation facilities). <br />▪ Service access and loading (along with 2-4 parking stalls) must be provided for the <br />utility housing along the northwest edge of the site. <br />▪ A clearance of at least 50’ to be maintained around the perimeter of the traction <br />power building at the northeast corner of the site. <br />o This section provides parameters for station access by BART riders, with a special focus <br />on ADA access. <br /> <br />• Safety and Security <br />o This section provides helpful reminders around design, identification and signage for <br />emergency access and maintenance areas. It also references CPTED (Crime <br />Prevention Through Environmental Design) principles to be integrated into the design of <br />any new buildings. <br /> <br />• Fire Protection <br />o This section lists all applicable safety standards for new buildings on BART property. <br /> <br /> <br /> <br />DRA <br />F <br />T
The URL can be used to link to this page
Your browser does not support the video tag.