My WebLink
|
Help
|
About
|
Sign Out
Planning Commission Agenda Packet 102225 (1)
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
10-22
>
Planning Commission Agenda Packet 102225 (1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2025 4:35:02 PM
Creation date
12/30/2025 4:30:37 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> May 2025 1 City of Pleasanton <br />5859 Owens Drive <br />Fire Flow Analysis <br /> <br /> <br /> <br />May 5, 2025 <br /> <br />City of Pleasanton <br />3333 Busch Rd <br />Pleasanton, CA 94566 <br /> <br /> <br />Attention: Ryan Ravalin <br /> Chief Utilities System Operator <br /> <br /> <br />Subject: 5859 Owens Drive – Fire Flow Analysis <br /> <br />Hi Ryan, <br />We are attaching our completed Fire Flow Analysis results for the hydrant located in the <br />Pleasanton Bart Parking Lot, north of Owens Drive, as well as some brief discussions of <br />assumptions, tabulated analysis results, and conclusions. <br />ASSUMPTIONS <br />• Analysis is performed using the City’s existing domestic water system hydraulic <br />model. <br />• Fire flow requirement for the existing commercial development is 2,500 gpm for a <br />duration of 2 hours based on the City’s Master Plan. <br />• Minimum pressure criteria of 20.0 psi for fire flows based on the City’s Master <br />Plan. <br />• Maximum velocity criteria of 10.0 ft/s for fire flows, excluding hydrant laterals, <br />based on the City’s Master Plan. <br />• Analysis is conducted under Maximum Day Demand conditions. <br />• Fire flow analysis performed during low tank water levels based on the current 7- <br />day fill/drain cycle operations. <br />• PRVs are in service. <br />• Hydrant elevation is assigned via DEM records and validated using Google <br />Earth. <br /> <br /> <br />Smart Planning Our Water Resources
The URL can be used to link to this page
Your browser does not support the video tag.