My WebLink
|
Help
|
About
|
Sign Out
Planning Commission Agenda Packet 102225 (1)
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
10-22
>
Planning Commission Agenda Packet 102225 (1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2025 4:35:02 PM
Creation date
12/30/2025 4:30:37 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />2 <br />BOD and Maintenance Responsibility Matrix is required when submitting plans for review by <br />BART, and providing them is a prerequisite for BART’s review. <br />The Maintenance Responsibility Matrix should include a list of assumptions detailing which <br />entity would be responsible for maintaining the proposed infrastructure. (For example: BART is <br />assumed to maintain lighting in the station and substation areas, but the Developer should <br />maintain lighting in public spaces near the proposed development. Lighting on BART property <br />shall comply with the foot-candle requirements of the current BART Facilities Standards [BFS]. <br />Lighting on leased parcels shall comply with the foot-candle requirements of the local permitting <br />jurisdiction, unless shared use with BART patrons. Lights not maintained by BART shall be <br />connected to a new power source from PG&E and metered to the Development; separate <br />metering may be necessary for lighting that might impact BART patrons.) <br />The following is a table template recommended to ensure BART understands the design <br />assumptions for the project: <br /> <br />Owner List of <br />Assets <br />Maintenance <br />Provider <br />Additional <br />Permitting <br />Agencies <br />Design <br />Criteria <br />Design Criteria <br />Exception Request <br />BART BFS <br />Developer <br />or Third- <br />Party <br /> <br />City or other <br />agency <br /> <br />Preliminary Design Criteria/Requirements Considerations for Dublin/Pleasanton TOD <br />Improvements: <br />Based on the existing site and future BART planning for improvements, the following criteria <br />have been developed. Relevant sections of the BART Facilities Standards (BFS) can be <br />provided for reference, if needed. The Developer team shall address the following in the BOD: <br />A) Utilities <br />a. Any new or relocated wet utilities (such as water and sewer) and <br />communication/electrical conduits serving the District are to be clear and away <br />from the private structural developments. All the requirements of National Fire <br />Protect Association 13 (NFPA 13) and BFS are applied. <br />b. Sewer and Water connections to existing BART facilities shall not be disrupted <br />during operation hours. <br />c. Irrigation: New BART irrigation system to be certified by CalSense is required to <br />serve the Remainder Parcel(s).
The URL can be used to link to this page
Your browser does not support the video tag.