My WebLink
|
Help
|
About
|
Sign Out
Planning Commission Agenda Packet 102225 (1)
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
10-22
>
Planning Commission Agenda Packet 102225 (1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2025 4:35:02 PM
Creation date
12/30/2025 4:30:37 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />San Francisco Bay Area <br />Rapid Transit <br />MEMORANDUM <br />To: Dublin/Pleasanton Station Transit-Oriented Development Team <br />Date: September 8, 2025 <br />Re: Dublin/Pleasanton Station TOD Basis of Design Criteria <br />Here is a summary of criteria to be incorporated into the Dublin/Pleasanton Station Transit <br />Oriented Development (TOD) Basis of Design (BOD). These criteria are intended to provide the <br />Developer’s Design Team with information to develop a comprehensive and project specific <br />BOD and Maintenance Responsibility Matrix that will be submitted and reviewed by BART to <br />communicate how the development intends to address the operational and design needs of the <br />District. This initial statement of criteria is not intended to replace future criteria that will <br />result from site specific field and technical investigations. The development team is <br />responsible for verification of actual field conditions and addressing code compliance <br />requirements as they apply to this development both from local agencies and BART. <br />Should additional information be required, a request should be made through Shannon Dodge, <br />Principal Property Development Officer with BART Transit-Oriented Development. Some <br />information will require Security Sensitive Information (SSI) clearance, and some files may be <br />required to be viewed on BART property only. <br /> <br />BART Permits: <br />1) Permits for development on BART property are required. Permits will be required for: <br />a. Site Investigation (drilling, monitoring, surveying of BART facilities) <br />b. All construction and staging on non-leased parcel(s). <br />c. Operation of facilities in and under the BART Operating Envelope and station. <br />2) BART Permit conditions will include limitations to minimize passenger impacts, <br />emergency access, maintain the security of the station, and mitigate any impacts on the <br />maintenance and station operations. <br />3) BART permit conditions may include considerations with respect to passenger impacts, <br />security, and transit and maintenance operations. <br /> <br />Design Considerations for the BOD and Maintenance Responsibility Matrix: <br />The development team should prepare BOD and Maintenance Responsibility Matrix submittals <br />that address the operational requirements and constraints included herein. Submission of the
The URL can be used to link to this page
Your browser does not support the video tag.