My WebLink
|
Help
|
About
|
Sign Out
Planning Commission Agenda Packet 102225 (1)
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
10-22
>
Planning Commission Agenda Packet 102225 (1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2025 4:35:02 PM
Creation date
12/30/2025 4:30:37 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BART Concept Plan Planning Commission <br />6 of 9 <br />And, a commenter observed that prior to the pandemic, the parking lots filled up quickly – <br />resulting in BART riders having to park far from the station. <br />CONCEPTUAL DEVELOPMENT SCENARIOS <br />Key Planning Considerations: There are several background conditions and planning <br />considerations for the site. They include: <br /> <br />• Site planning and configuration that takes into account the property's ongoing <br />functioning as a BART station (i.e., station access), existing infrastructure and <br />easements, such as the Iron Horse trail alignments, utilities, and BART service <br />equipment <br />• Transit stops and multi-modal circulation through the station <br />• Parking demand for both on-site development and BART rider parking <br />• Parking supply factoring in off-site parking capacity in the vicinity (including the Alameda <br />County parking garage) <br />• Complementary uses to the allowable housing <br />• Integration of other site improvements, particularly the anticipated Valley Link station <br />• Minimum zoning requirements of state law and regional policy requirements <br />• Mitigation of noise and freeway-related impacts <br />• Connectivity to the broader area and adjacent properties, and potential future <br />development of the adjacent vacant Oracle property <br />• Building design requirements for proposed development <br />• Input and comments from key stakeholders. <br /> <br />Policy Goals and Objectives for Transit-Oriented Development <br />BART has established policy goals for TOD around its stations, covering the following topic <br />areas: Complete Communities, Sustainable Communities Strategy, Ridership, Value Creation <br />and Value Capture, Transportation Choice, and Affordability. The Concept Plan would <br />incorporate these goals, tailored to the subject station and project site, specifically in the areas <br />of vitality in the area with a variety of supportive uses, addressing housing both affordable and <br />market-rate housing needs, and increase the share of BART patrons who use alternatives to <br />driving to get to the station (e.g., walk, bike, take transit). A draft of the goals and objectives <br />(named Pleasanton Transit-Oriented Development at Dublin/Pleasanton BART Station – Goals <br />and Objectives) is included as Exhibit C to this report. <br /> <br />Site Re-use Scenarios <br />The draft re-use options are included in detail as Exhibit A to this report. The following is a <br />summary of the scenarios: <br /> <br />• Development Scenarios: The site is approximately 14.9 gross acres (approximately <br />11.34 net acres) and could be developed as three to four parcels (compared to the two <br />existing parcels). <br /> <br />In the four-parcel scenario, each parcel would be between approximately 2.4 to 4.3 <br />acres, with buildings five to seven stories high and housing between 870 and 1,088
The URL can be used to link to this page
Your browser does not support the video tag.