Page 5 of 6 <br />requirements will also be identified at this stage. <br /> <br />Contingency <br />Staff recommends a design and construction contingency of 20 percent of the estimated <br />project costs. A higher contingency is recommended as the project is at the initial scoping <br />phase, and a majority of the work area was not readily available for review by bidders; <br />proposed locations of conduit runs and panels will be determined during the design process <br />within areas currently inaccessible. <br /> <br />EQUITY AND SUSTAINABILITY <br />This project supports the City’s equity and sustainability goals by ensuring safe, reliable, and <br />accessible public facilities for all who work in or visit City buildings. Maintaining modern fire <br />alarm and communication systems enhances community resilience and aligns with the Climate <br />Action Plan (CAP 2.0) goal of promoting safe and sustainable public infrastructure. <br /> <br />OUTREACH <br />No outreach was conducted during the fire alarm RFP process, as this item is a routine matter <br />of City business. Adjacent neighbors, the school district, and Library patrons will be given <br />notice prior to the start of construction. <br /> <br />STRATEGIC PLAN ALIGNMENT <br />Approval of this action advances the ONE Pleasanton citywide strategic goals of Investing in <br />Our Environment – Strategy 1 by implementing the City’s four-year Capital Improvement <br />Program (CIP) through the design and construction of budgeted projects (CIP Nos. 23457 and <br />26386). It also supports Safeguarding Our City – Strategy 1 by enhancing the City’s <br />emergency preparedness capabilities and ensuring that essential public facilities are properly <br />equipped to respond to disasters. <br /> <br />FISCAL IMPACT <br />The OSC Fire Alarm & Notification System, CIP No. 23457, is funded as part of FY 2022/23 <br />and received additional funding allocation in FY 2024/25. The Library Fire Alarm Upgrade, CIP <br />No. 26386, is funded as part of FY 2025/26. The total programmed amount for both projects is <br />$1.85 million. The total anticipated project expenditure for the recommended proposal is $1.25 <br />million, which includes design and construction contingency, soft costs, and on-call <br />professional services. This also includes the addition of the Police Station and LPFD Training <br />Center fire alarm upgrades. A project contingency of 20 percent will address both the <br />unforeseen scope of work identified during the detailed design and permitting phases, as well <br />as the existing conflicts that may arise once the walls and ceilings are opened up during <br />construction. The funding and anticipated project expenditures are detailed in Attachment 2. <br /> <br />Prepared by: Submitted by: Approved by: <br /> <br />Adam Nelkie, Assistant Dir. <br />of Public Works - <br />Engineering <br />Siew-Chin Yeong, Director of Public <br />Works <br /> <br />Gerry Beaudin, City <br />Manager <br /> <br />Docusign Envelope ID: 1D34CC79-5A3B-46B0-A38E-AB5F8C8EF441