Laserfiche WebLink
DELUCCHI PARK MUSICAL PLAZA <br />SITE CONSTRUCTION PLAN <br />SEPTEMBER 4, 2025 SHEET L1 <br />SCULPTURE BASE NTS <br />4" <br />16 <br />Notes1. Installation of sculpture to be by others.2. All concrete to be liquid Sierra by Davis Colors.3. The bid price shall include construction of the improvments in two phases: Phase 1- To occur Fall 2025 and include construction of the plaza, scuplture base, and irrigation and planting. Phase 2 - To occur Spring 2026 and include installation of the plaque and musical instruments. <br /> Bid Alternate - Install all improvements in Spring 2026. <br />Extend ex. irrigation sleeve 12" <br />beyond proposed concrete <br />Ex. valve and stub for trees <br />Plaque, 10.5" wide x 6" tall, provided by the City <br />Form in 10.5" wide x 6" tall flat face for plaque <br />Docusign Envelope ID: B37E565A-6EA0-48E7-8AE5-6316D43B8752Docusign Envelope ID: 1727C9B2-D261-49ED-9BE1-A9F0AFD579A5