Laserfiche WebLink
CITY OF PLEASANTON  TTCASANJ011431.2025 14 <br />PROPOSAL FOR <br />CITY OF PLEASANTON <br />QUIET ZONE <br />Design elements that could be exercised by this optional task include, but are not limited to: replacement or upgrade <br />of train-activated warning devices, installation of a four-quadrant (4) gate system, or sidewalk or curb reconstruction for <br />ADA compliance. Traffic signal modifications, including modifications to the existing interconnect system at Santa Rita <br />Road, additional queue mitigations, and preparation of a preemption package for UPRR/CPUC approvals are excluded <br />from this task. <br />TASK 9: DESIGN SUPPORT DURING CONSTRUCTION (DSDC) <br />Kimley-Horn will provide support to the City during the duration of the construction contract with the contractor. The City <br />will provide a construction manager to administer the contract and coordinate with the contractor. The following tasks <br />are anticipated with Kimley-Horn's effort under this project phase and task: <br /> ◢Up to two (2) site visits and associated Observation memo <br /> ◢Attend one (1) final punch list site walk with City and contractor staff <br /> ◢Attend one (1) substantial completion site walk with documentation <br /> ◢Review and respond to contractor questions, including: <br /> Design submittals <br /> Requests for Information (RFIs) <br /> Substitution requests <br /> ◢Preparation of record drawings based on as-built drawings provided by the contractor including detailed markups on <br />the construction documents. As-builts will be prepared in Bluebeam (PDF) format. <br />Task 9 Deliverables: <br /> ✓RFI responses during construction <br /> ✓Submittal review and responses during construction <br /> ✓Observation report for site visits <br /> ✓Close out punch list from site walk with City and Contractor <br /> ✓Record Drawings in Bluebeam (PDF) format <br />Docusign Envelope ID: 2430EB25-F48A-45D4-91C5-9340C4FBB5C9