Laserfiche WebLink
TOP OF STAKE 6" <br />BELOW HEAD <br />OBSERVATION TUBE. 4" <br />PERF. PVC PIPE WITH CAP <br />4" TALL EARTH BERM FOR <br />WATER BASIN: <br />3" DIA. FOR 15 GAL <br />4' DIA. FOR 24" BOX <br />5' DIA. FOR 36" BOX <br />RUBBBER TIES PLACED 6" MAX BELOW <br />MAIN FORK OR BRANCH <br />BACK FILL MIX: 70% PULVERIZED <br />NATIVE SOIL, 30% COMPOST, <br />UNLESS OTHERWISE SPECIFIED <br />IN SOIL AMENDMENT SPECS <br />PLANTING HOLE, PULVERIZED <br />NATIVE SOIL; SCARIFY WALLS <br />FINISH GRADE <br />3' STAKE <br />DEPTH <br />PLANT HOLE DIAMETERS: <br />15 GAL: 3'-6" <br />24" BOX:4'-6" <br />36" BOX:6'-0" <br />LARGER SIZES 2-3X DIA. OF ROOT BALL <br />NOTES: <br />1.KEEP TURF AND PLANTS OUTSIDE CIRCULAR EARTH BERM / <br />WATER BASIN. <br />2.WATER BY HAND UPON COMPLETION OF TREE PLANTING. FILL <br />BASIN SLOWLY WITH WATER FROM A HOSE. ALLOW WATER TO <br />SOAK IN AND CONTINUE TO WATER UNTIL ROOT BALL AND <br />ADJACENT SOIL ARE SATURATED. ADDITIONAL HAND <br />WATERING MAY BE REQUIRED TO AUGMENT IRRIGATION FOR <br />NEW PLANTING <br />3.FLOOD BUBBLERS REQUIREMENTS: <br />15 GAL: 2 <br />24” BOX: 3 <br />36” BOX: 4 <br />INCREASE THE NUMBER OF FLOOD BUBBLERS FOR TREES <br />WITH A ROOT BALL LARGER THEN 36” TO 4 BUBBLERS. ADD <br />AN ADDITIONAL BUBBLER FOR EACH 1' INCREASE IN SIZE <br />4.INSTALL ROOT CONTROL BARRIERS SUCH AS CENTRY ROOT <br />BARRIER AND 4-INCH PERFORATED PIPE FOR ALL TREES <br />LOCATED WITHING 8'FEET OF PAVEMENT OR OTHER <br />HARDSCAPE, DETERMINED BY THE CITY LANDSCAPE ARCHITECT. <br />ROOT BARRIERS SHALL BE LOCATED ALONG THE EDGE OF THE <br />PAVEMENT WHEREVER THE TREE IS WITHIN 8-FEET OF <br />PAVEMENT OR HARDSCAPE. <br />BARK MULCH: 3" DEPTH, KEEP <br />CLEAR FROM TRUNK OF TREE <br />ADJUSTABLE FLOOD BUBBLER WITH <br />BACKFLOW PREVENTER, SCH 80 PVC <br />MALE ADAPTER, 1 <br />2" IPS TUBING. LOCATE <br />BUBBLER AT CENTER OF ROOT BALL. <br />SEE NOTES FOR QUANTITY <br />PLANT TREE WITH FLARED ROOT CROWN <br />1-2" ABOVE SURROUNDING SOIL GRADE <br />SET ROOT BALL FIRMLY ON <br />UNDISTURBED OR WATER <br />SETTLED NATIVE SOIL <br />16-GAUGE STAINLESS STEEL WIRE <br />CUT WIRE 18" LONGER THAN <br />DESIRED <br />LENGTH, DIVIDE EXCESS <br />EVENLY <br />AT BOTH ENDS AND WRAP <br />EXCESS SECURELY <br />AT EACH END ALONG <br />RUNNING LENGTH OF WIRE. <br />2' <br />TYP. <br />1' <br />TYP. <br />1' <br />3 <br />8" DIA. WIRE EYE LAG, SCREWED IN PLASTIC CONCRETE ANCHORS, OR 3 <br />8" DIA. <br />WOOD EYE LAG SCREWS FOR WOOD SURFACES, IN 1 <br />4" DIA. PILOT HOLES <br />NOTES: <br />·INSTALL WITH A MINIMUM CLEARANCE OF 1.5" FROM STRUCTURE SURFACE. <br />·ATTACH WIRE EYE LAGS IN A SYMMETRIC GRID PATTERN CENTERED IN DESIRED <br />SPACE. <br />·THREAD WIRE THROUGH EYE LAGS IN MANNER INDICATED ABOVE TO CREATE <br />STRUCTURE ACCORDINGLY. <br />·WHEN VINES ARE TALL ENOUGH TO REACH THE BOTTOM WIRE, TIE VINE TO WIRE <br />WITH NURSERY TAPE. CONTINUE TO TIE VINES TO SUCCEEDING WIRES AS THE <br />VINES GROW. <br />·CUT TIP OF VINE TO ENCOURAGE BRANCHING. <br />LA <br />N <br />D <br />S <br />C <br />A <br />P <br />E <br />PL <br />A <br />N <br />T <br />I <br />N <br />G <br /> <br />D <br />E <br />T <br />A <br />I <br />L <br />S <br />REVISED: 7/10/2025 <br />DESIGN BY: RJD <br />DRAWN BY: KH <br />SCALE: AS NOTED <br />L2.2 <br />DE <br />S <br />I <br />G <br />N <br /> <br />F <br />O <br />C <br />U <br />S <br />LA <br />N <br />D <br />S <br />C <br />A <br />P <br />E <br /> <br />A <br />R <br />C <br />H <br />I <br />T <br />E <br />C <br />T <br />U <br />R <br />E <br /> & <br /> <br />C <br />O <br />N <br />S <br />T <br />R <br />U <br />C <br />T <br />I <br />O <br />N <br />DESIGN <br />FOCUS <br />PO BOX 485 <br />BEN LOMOND, CA 95005 <br />(831) 336-3100 <br />47 <br />5 <br /> <br />& <br /> <br />4 <br />9 <br />3 <br /> <br />S <br />T <br />. <br /> <br />J <br />O <br />H <br />N <br />PL <br />E <br />A <br />S <br />A <br />N <br />T <br />O <br />N <br />, <br /> <br />C <br />A <br />3 <br />SCALE: 3/4"=1'-0" <br />SHRUB AND GROUNDCOVER PLANTING 4 <br />SCALE: 1"=1'-0" <br />SHRUB AND GROUNDCOVER PLANTING LAYOUT 5 <br />SCALE: 1/4"=1'-0" <br />SHRUB PLANTING ON A SLOPE <br />1 <br />SCALE: 3/4"=1'-0" <br />TREE PLANTING AND STAKING 2 <br />SCALE: 1/2"=1'-0" <br />CABLE SUPPORT SYSTEM FOR VINE PLANTINGS