Laserfiche WebLink
P <br />R <br />O <br />J <br />E <br />C <br />T <br /> <br />N <br />O <br />R <br />T <br />H <br />M M <br />ACAC <br />AC AC <br />AC <br />AC <br />AC AC <br />ACAC <br />AC <br />AC <br />AC <br />AC <br />AC <br />AC <br />AC <br />AC <br />AC <br />AC <br />AC <br />AC <br />AC AC <br />AC AC <br />AC <br />AC <br />PL <br />A <br />N <br />T <br />I <br />N <br />G <br /> <br />S <br />H <br />E <br />E <br />T <br />IN <br />D <br />E <br />X <br /> <br />A <br />N <br />D <br /> <br />N <br />O <br />T <br />E <br />S <br />REVISED: 7/10/2025 <br />DESIGN BY: RJD <br />DRAWN BY: KH, MO <br />SCALE: 1/8"=1'-0" <br />L3.0 <br />DE <br />S <br />I <br />G <br />N <br /> <br />F <br />O <br />C <br />U <br />S <br />LA <br />N <br />D <br />S <br />C <br />A <br />P <br />E <br /> <br />A <br />R <br />C <br />H <br />I <br />T <br />E <br />C <br />T <br />U <br />R <br />E <br /> & <br /> <br />C <br />O <br />N <br />S <br />T <br />R <br />U <br />C <br />T <br />I <br />O <br />N <br />DESIGN <br />FOCUS <br />PO BOX 485 <br />BEN LOMOND, CA 95005 <br />(831) 336-3100 <br />47 <br />5 <br /> <br />& <br /> <br />4 <br />9 <br />3 <br /> <br />S <br />T <br />. <br /> <br />J <br />O <br />H <br />N <br />PL <br />E <br />A <br />S <br />A <br />N <br />T <br />O <br />N <br />, <br /> <br />C <br />A <br />L3.1 <br />L3.6 L3.7 <br />L3.3 <br />L3.8L3.5 <br />L3.4 <br />L3.9 <br />OFFSITE PLANTING PLANS <br />L3.1 OFFSITE PLANTING PLAN <br />COMMON AREA PLANTING PLANS <br />L3.2 COMMON AREA PLANTING PLAN <br />L3.3 COMMON AREA PLANTING PLAN <br />L3.4 COMMON AREA + LOT D PLANTING PLAN <br />ONSITE PLANTING PLANS <br />L3.5 LOTS 1-3 PLANTING PLAN <br />L3.6 LOTS 4-7 PLANTING PLAN <br />L3.7 LOTS 8-11 PLANTING PLAN <br />L3.8 LOTS 12-14 PLANTING PLAN <br />L3.9 COMMERCIAL PLANTING PLAN <br />HYDROZONE PLAN <br />L4.1 HYDROZONE PLAN <br />NOTES <br />-LANDSCAPE PLANS WILL COMPLY WITH THE CITY'S WATER EFFICIENT LANDSCAPE ORDINANCE (MWELLO) <br />AND BAY FRIENDLY BASICS LANDSCAPE CHECKLIST <br />-CONTRACTOR TO OBTAIN AN ORGANIC SOIL REPORT FROM WAYPOINT ANALYTICAL WITH ORGANIC <br />FERTILIZER/AMENDMENT RECOMMENDATIONS PRIOR TO PLANTING INSTALLATION <br />-SOIL ANALYSIS REPORT TO BE SUBMITTED AFTER CONSTRUCTION WITH THE CERTIFICATE OF <br />COMPLETION <br />-3" OF RECYCLED CONTENT MULCH TO BE INSTALLED AROUND ALL PLANTS <br />-COMPOST (CDFA-REGISTERED ORGANIC COMPOST OR OMRI-CERTIFIED COMPOST) TO BE APPLIED AT <br />A MINIMUM RATE OF 4 CY/1,000 SF OR AT A RATE TO BRING SOIL ORGANIC MATTER UP TO 6% BY DRY <br />WEIGHT AS INDICATED IN THE SOIL REPORT. <br />-COMPOSTED TO BE INCORPORATED AT LEAST 6" DEEP, UNLESS OTHERWISE SPECIFIED IN THE <br />ORGANIC SOIL REPORT <br />L3.2