My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR MEETING AGENDA PACKET 2-3-26
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
020326 REGULAR
>
CITY COUNCIL REGULAR MEETING AGENDA PACKET 2-3-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2026 10:24:56 AM
Creation date
1/30/2026 10:22:03 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/3/2026
DESTRUCT DATE
15Y
DOCUMENT NO
AGENDA PACKET
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 2 <br />the satisfaction of the Director of Public Works. Staff recommends the City Council accept the <br />work, authorize the City Clerk to file a Notice of Completion, and authorize the release of the <br />retention 30 days after recordation. <br /> <br />EQUITY AND SUSTAINABILITY <br />Ensuring the safe condition of Pleasanton's streets benefits all residents and visitors who travel <br />on local roadways. <br /> <br />OUTREACH <br />Construction notices, social media messaging, and information on the City’s website were <br />provided before the start of construction. The contractor hand-delivered construction notices to <br />businesses and residents in the area where the project occurred. <br /> <br />STRATEGIC PLAN ALIGNMENT <br />Approval of this action advances the ONE Pleasanton strategic plan goal of Investing in Our <br />Environment, Strategy 1 – Implement the four-year Capital Improvement Program (CIP) to <br />complete design and construction of budgeted capital projects. <br /> <br />FISCAL IMPACT <br />Funding for this project totaled $785,000, and the available balance for the Annual Slurry <br />Sealing of Various Streets project, following a transfer to the Annual Resurfacing and <br />Preventative Maintenance, CIP No. 25503, to cover the costs for base repairs on slurry seal <br />streets, was $385,000. Project expenditures totaled $301,061, including final contract <br />($293,007) and change order with Sierra Nevada Construction, Inc. ($1,847), material testing <br />by the City’s on-call contractor ($5,384), and other project support costs ($824), leaving a <br />balance of $83,939 (see Attachment 3). Staff recommends that the project balance be returned <br />to the fund balance in the Gas Tax Fund (Fund 160) for all future eligible projects through the <br />CIP Prioritization process. <br /> <br />Prepared by: Submitted by: Approved by: <br /> <br />Adam Nelkie, Assistant Dir. <br />of Public Works - <br />Engineering <br />Siew-Chin Yeong, Director of Public <br />Works <br /> <br />Gerry Beaudin, City <br />Manager <br /> <br />Attachments: <br />1. Slurry Street List <br />2. Location Map <br />3. Financial Expenditure Summary, CIP No. 25504 <br /> <br />Page 17 of 80
The URL can be used to link to this page
Your browser does not support the video tag.