Laserfiche WebLink
ITEM NO. 11 <br />ORIGINATING SECTION: Groundwater <br />CONTACT: Colleen Winey/Ken Minn <br />AGENDA DATE: January 21, 2026 <br />SUBJECT: Update on the Regional Groundwater Facilities Improvement Project – Phase I <br />Feasibility Study Results <br />SUMMARY: <br />•To support the Mission to deliver safe, reliable, efficient, and sustainable water, Zone 7 <br />Water Agency (Zone 7) partnered with the City of Pleasanton to evaluate the feasibility of a <br />Joint Regional Groundwater Facilities Project (the joint project) in the Bernal subbasin. This <br />action supports Strategic Plan Goal B – Reliable Water Supply and Infrastructure, Goal C – <br />Safe Water, and Goal D – Groundwater Management. It is also to implement Strategic Plan <br />Initiative #5 – Develop a diversified water supply plan and implement supported projects <br />and programs, Initiative #9 – Implement the PFAS Management Strategy, and Initiative <br />#11 - Manage the Groundwater Sustainability Agency and implement the Groundwater <br />Sustainability Plan. <br />•Zone 7 has been exploring the Bernal subbasin to recover the groundwater production <br />capacity, which has been reduced due to out-of-commission wells and per- and <br />polyfluoroalkyl substances (PFAS) treatment process, and to meet projected future <br />demands. The City of Pleasanton is also planning to install new groundwater wells to <br />recover its annual groundwater pumping quota of 3,500 acre-feet. <br />•If feasible, installing additional groundwater wells in the Bernal subbasin will enable Zone 7 <br />to become more resilient to multi-year droughts by providing additional groundwater supply, <br />operational flexibility, and redundancy, thereby increasing water supply reliability. The <br />project could be upsized to accommodate Pleasanton’s groundwater pumping quota. <br />•Developing a joint project with the City of Pleasanton will be mutually beneficial, as it will <br />enable both parties to achieve significant cost savings through economies of scale, <br />minimize the impact on the local community and environment, and gain operational <br />efficiencies through centralized treatment. <br />•Zone 7’s existing infrastructure, including the distribution system and the water treatment <br />facilities at Hopyard well field, can be upgraded to make integrating new production wells <br />to the existing system more cost-effective and efficient without the need to construct a <br />new (non-PFAs) groundwater treatment facility. Groundwater treatment typically includes <br />the addition of standard disinfectants. <br />Page 24 of 80