Laserfiche WebLink
Page 2 <br />•Phase I of the project, the feasibility study, has involved installing up to three test wells on <br />the City of Pleasanton’s property to assess potential yields at these locations and analyze <br />groundwater quality. It also involved analyzing PFAS mobilization using the newly <br />developed groundwater flow model and developing a basis of design for the transmission <br />pipeline and water treatment facility upgrades at the Hopyard well field. Preliminary results <br />were presented to the Board at the June 18, 2025, meeting. <br />•The feasibility study and the Basis of Design Report (BODR) were completed on December <br />31, 2025. The City of Pleasanton and Zone 7 Staff will analyze the study findings and the <br />BODR to determine the optimal number and locations of wells, pipelines, and facility <br />upgrades, roles and responsibilities, and terms of cost-sharing, construction, and O&M <br />agreements. <br />•At the January 21 Board meeting, the findings of the Feasibility Study will be presented. <br />The discussion at the January 21 Board meeting will not include next steps. That discussion <br />would occur after staff from Zone 7 and Pleasanton have fully reviewed the Feasibility <br />Study and have worked together to recommend next steps. <br />FUNDING: <br />No funding is requested at this time. <br />RECOMMENDED ACTION: <br />Information only. <br />Page 25 of 80