Laserfiche WebLink
June 2025 15 <br />Summary <br />•New chloramination <br />facility building (30’W x <br />50’L) <br />•2,000-gallon ammonia <br />storage <br />•6,000-gallon sodium <br />hypochlorite storage <br />•Partial retrofit of existing <br />facility <br />•Design/construction <br />provisions to keep HCF <br />operational through <br />construction <br />Hopyard Chloramination Facility Upgrades <br />June 2025 <br />Estimated Project Cost (AACE Level 4) <br />16 <br />Page 33 of 80