Laserfiche WebLink
Summary <br />•Project is feasible <br />•The preferred alternative is two wells in Tennis and Hansen Parks <br />•The project is estimated to produce over 8,200 AFY in a drought <br />•The project cost is estimated at $42.3 million <br />•City of Pleasanton and Zone 7 Staff to analyze study findings and <br />BODR to determine next steps <br />•Recommendations to the Board in a future meeting <br />17 <br />Questions? <br />18 <br />Page 34 of 80