My WebLink
|
Help
|
About
|
Sign Out
AMERICAN CEMETERY MAINTENANCE AND BURIAL
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
A
>
AMERICAN CEMETERY MAINTENANCE AND BURIAL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2026 10:50:58 AM
Creation date
2/2/2026 10:48:17 AM
Metadata
Fields
Template:
CONTRACTS
Description Type
Maintenance Services
Contract Type
New
NAME
AMERICAN CEMETERY MAINTENANCE AND BURIAL
Contract Record Series
704-05
Munis Contract #
2026366
Contract Expiration
1/1/2026
NOTES
BURIAL SERVICES AND GROUNDS MAINTENANCE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
opening of the gravesite and burial. Gravesite preparation shall be accomplished in a timely <br />fashion, so as not to impede scheduled services. <br />7.03 Graveside preparation-The contractor shall be responsible for setting up the tent(s), chairs, <br />and lawn greens at the graveside. At least one member of the Contractor's burial crew must <br />remain on-site until the family has left the Cemetery. Lowering the casket, tearing down the <br />setup, and placing the lid shall be conducted in a professional, careful, and considerate manner. <br />7 .04 Installation of vaults as needed -The Contractor shall have equipment and personnel to <br />safely prepare and install cement grave vaults as requested for burial services. Concrete vaults <br />are provided by the City. Depending on the location of the grave, the Contractor may choose to <br />either hand-dig or use heavy equipment to facilitate the installation of the vault. The vault will be <br />installed in accordance with standard cemetery practices that comply with all applicable state <br />regulations and city codes. During the vault installation process, if an unexpected obstacle arises, <br />such as a previously installed adjacent vault encroaching on the burial space or any other <br />irreparable object, the Contractor will collaborate with the City staff to resolve the issue, which <br />may necessitate a fee adjustment. <br />7.05 Ground leveling and soil compacting for new -New gravesites are to be cleared, tamped, <br />sunk, and leveled with the surrounding terrain within seven (7) calendar days of burial services. <br />Within twenty (20) calendar days following initial leveling, perform a follow-up leveling for re- <br />vegetation. <br />7.06 Marker installation -The Contractor shall install headstones and markers within seven (7) <br />days of notification by the City Staff. The Contractor shall ensure the site layout and preparation, <br />and install headstones and markers. Headstones shall be handled in a manner that prevents <br />damage. The Contractor shall ensure that flat markers shall be uniform in height (parallel with <br />the ground and no more than 1 inch above grade) and horizontally and vertically aligned. The <br />Contractor shall provide headstone resetting for up to 1 headstone or marker per week. The <br />Contractor is not responsible for the purchase and delivery of the monuments, headstones, and <br />markers to the cemetery. <br />7 .07 The Contractor shall perform regular grave site clean-ups on the pt and 3rd Friday of each <br />month. The contractor shall remove and dispose of all cemetery decor in accordance with Section <br />10 of the Pleasanton Cemetery Rules and Regulations. The Contractor may remove, at any time, <br />items that are unsightly, dangerous, or detrimental (as determined by City staff or the <br />Contractor). <br />7.08 The Contractor shall remove trash from all receptacles, replace the receptacles' liners <br />throughout the site each week, and place the trash in the PGS-provided collection bins every <br />Monday. The City will be responsible for PGS bills. <br />SECTION 8. EQUIPMENT <br />The Contractor shall obtain its own backhoe, or rent one as needed, to provide the burial <br />services. <br />20 <br />Docusign Envelope ID: B1A2B84F-219F-40B7-B41B-2FF5FEF8647B
The URL can be used to link to this page
Your browser does not support the video tag.