Laserfiche WebLink
23 <br />CIP Summary –Prioritize Scenario <br />Projections 45 <br />FY 2030FY 2029FY 2028FY 2027FY 2026Capital Improvement Projects (CIP) <br />Prioritize <br />Priority A - Condition AssesmentProjects <br />$3,649,959$3,509,576$6,749,184$973,440$759,200Pipeline Replacement (1-2 mile of system) <br />$0$0$3,442,084$292,032$0Amberwood Siphon <br />$425,829$409,450$393,702$378,560$0Priority A - Annual Sewer System Improvements for Resurfacing <br />$0$0$0$162,240$0Large Diameter Inspection Study <br />$0$0$0$1,081,600$676,000Denker Road Sewer Replacement <br />$0$0$0$162,240$0Cathodic Protection and I&I Studies <br />$1,216,653$1,169,859$1,124,864$0$0Cathodic Protection Installation <br />$0$0$337,459$324,480$0Force Main Desktop Analysis and Inspections <br />$0$0$0$0$138,069Sewer System Management Plan <br />$0$0$0$0$0Placeholder <br />$0$0$0$0$0Placeholder <br />$0$0$0$0$0Placeholder <br />$5,292,440$5,088,885$12,047,293$3,374,592$1,573,269Subtotal - Priority A - Condition Assesment Projects <br />$10,076,654$13,851,125$16,782,971$4,348,140$6,429,976Total - Prioritize <br />CIP Summary –Defer Scenario <br />Projections 46 <br />FY 2030FY 2029FY 2028FY 2027FY 2026Capital Improvement Projects (CIP) <br />Defer <br />Priority A - Capacity & Reliability Improvement Projects <br />$0$0$0$0$1,664,000Project 1B: Upsize Sunol Blvd Sewers <br />$3,564,793$467,943$0$0$0Project 2A: Bernal Ave Pipe Bridge <br />$0$0$0$0$0Project 3: Upsize Pipes downstream of Stoneridge Mall <br />$270,432$0$0$0$0Project 4A: East Pleasanton Capacity Project A (Kiewit and Arroyo Lago) <br />$0$0$0$0$0Project 4B: East Pleasanton Capacity Project B (Amazon, East Lakes, Site H) <br />$0$0$0$0$520,000West Las Positas Boulevard Multimodal Reconstruction <br />$0$0$0$0$38,140Sewer Capacity Evaluation <br />$0$0$0$0$0Placeholder <br />$0$0$0$0$0Placeholder <br />$0$0$0$0$0Placeholder <br />$3,835,225$467,943$0$0$2,222,140Subtotal - Priority A - Capacity & Reliability Improvement Projects <br />Priority A - Lift Station Projects <br />$0$0$0$0$0LS-02, -07, -08, -10 Improvements <br />$0$0$0$0$0LS-04, -12, -13, -15 Improvements <br />$0$6,211,949$911,140$0$0LS-05 Full Replacement Project <br />$0$0$0$540,908$31,302EARS and EALS Condition Assessment, Capacity Evaluation, and Predesign <br />$912,490$292,465$0$0$1,934,400Generator Replacement - Sewer and Storm <br />$0$0$0$0$668,864Sewer Station S-14 Electrical Improvements <br />$0$0$0$0$0Placeholder <br />$0$0$0$0$0Placeholder <br />$0$0$0$0$0Placeholder <br />$912,490$6,504,414$911,140$540,908$2,634,566Subtotal - Priority A - Lift Station Projects <br />Page 129 of 144