Laserfiche WebLink
24 <br />CIP Summary –Defer Scenario <br />Projections 47 <br />FY 2030FY 2029FY 2028FY 2027FY 2026Capital ImprovementProjects (CIP) <br />Defer <br />Priority A - ConditionAssesment Projects <br />$1,824,979$1,754,788$1,687,296$340,704$759,200Pipeline Replacement (1-2 mile of system) <br />$3,722,958$315,862$0$0$0Amberwood Siphon <br />$304,163$292,465$281,216$0$0Priority A - Annual Sewer System Improvements for Resurfacing <br />$0$0$0$162,240$0Large Diameter Inspection Study <br />$0$0$0$1,081,600$676,000Denker Road Sewer Replacement <br />$0$0$0$162,240$0Cathodic Protection and I&I Studies <br />$608,326$584,929$562,432$0$0Cathodic Protection Installation <br />$0$0$337,459$324,480$0Force Main Desktop Analysis and Inspections <br />$0$0$0$0$138,069Sewer System Management Plan <br />$0$0$0$0$0Placeholder <br />$0$0$0$0$0Placeholder <br />$0$0$0$0$0Placeholder <br />$6,460,427$2,948,044$2,868,403$2,071,264$1,573,269Subtotal - Priority A - ConditionAssesment Projects <br />$11,208,141$9,920,401$3,779,543$2,612,172$6,429,976Total - Defer <br />CIP Scenario Summary <br />Projections 48 <br />FY 2030FY 2029FY 2028FY 2027FY 2026CIP Scenarios <br />Scenarios <br />$6,657,859$10,563,823$11,046,164$3,807,340$6,429,976Maintain <br />$10,076,654$13,851,125$16,782,971$4,348,140$6,429,976Prioritize <br />$11,208,141$9,920,401$3,779,543$2,612,172$6,429,976Defer <br />•Provided CIP was inflated by 4% starting in FY 2026 <br />•All CIP is expected to be funded through rates/reserves and debt <br />Page 130 of 144