My WebLink
|
Help
|
About
|
Sign Out
PAKPOUR CONSULTING GROUP, INC. (#2026404)
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
P
>
PAKPOUR CONSULTING GROUP, INC. (#2026404)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 9:28:57 AM
Creation date
2/12/2026 9:25:40 AM
Metadata
Fields
Template:
CONTRACTS
Description Type
Professional Services
Contract Type
New
NAME
PAKPOUR CONSULTING GROUP, INC.
Contract Record Series
704-05
Munis Contract #
2026404
Contract Expiration
6/30/2030
NOTES
UTILITY PROGRAM MANAGEMENT AND PROJECT MANAGEMENT SERVICES
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 5 of 7 <br />inspection consultants, as well as the efforts of City staff working on utility projects. A Task <br />Authorization for each project or group of projects will be issued under the contract. <br /> <br />Function 5 – Outreach Support <br />This function supports communication and stakeholder engagement throughout program <br />development and project delivery to help maintain transparency and public confidence in <br />program delivery. The PMP, developed in Scope 1, will define the outreach program. A future <br />Task Authorization will be issued based on the defined scope of services, with clear and <br />measurable deliverables outlined in the contract. <br /> <br />Contract Assurances and Cost Controls <br />To ensure PCG meets the enhanced delivery goals, Task Authorizationswill be established <br />and issued under the contract, and will detail specific scope, budget, schedule, assumptions, <br />and delivery milestones. This approach enables the City to review budgets, scope, schedule, <br />and define milestones at each stage, ensuring the program remains on schedule to achieve <br />the delivery goals outlined in the master plans. Each Task Authorization’s delivery milestones <br />will be structured to withhold payment until each project meets the defined delivery milestones. <br />Billing is based on a not-to-exceed time-and-materials model, with payments made for each <br />function’s defined delivery milestones.This provides the cost savings benefits to the City under <br />the time-and-materials payment methodology, while ensuring a quality product and timely <br />delivery by withholding payments until milestone deliverables and quality standards are met. In <br />addition, the contract can be canceled at any time by the City if the Consultant does not meet <br />delivery expectations. <br /> <br />Individual projects will be designed by a bench of consultants specializing in utility project <br />design and construction management. These consultants will be procured and managed by <br />PCG, but contracts will be held directly with the City. This structure ensures sufficient design <br />capacity and specialized expertise to deliver projects. At the same time, the City retains the <br />ability to exercise control over the contracts or transition from PCG with minimal interruptions <br />to advancing project design and delivery work. <br /> <br />Phase I of the contract, with an estimated budget of $2.5 million, will extend through June 30, <br />2027, and will cover the first 18 months following contract execution. Phase I will focus on <br />program startup and development, including preparation of the Program Management Plan; <br />transition of existing active CIP projects by early January 2026; development of the master <br />schedule; resource analysis; detailed project scoping; water bond procurement; CIP project <br />updates; and procurement of design, construction management/inspection, and general <br />engineering support services, as further outlined in Exhibit A, Scope of Services. <br /> <br />Phase II of the contract, with an estimated budget of $2.5 million, will begin July 1, 2027, and <br />extend through June 30, 2030. Phase II will continue Scope 1 through Scope 5 services, with a <br />planned reduction in Program and Project Management support as program development is <br />completed and responsibilities are progressively transitioned back to City staff. <br /> <br />EQUITY AND SUSTAINABILITY <br />Approval of this item supports the City’s sustainability goals by facilitating implementation of <br />long-term water and wastewater infrastructure planning and investment. The recommended <br />contract supports the delivery of CIP projects that enhance system reliability, protect public <br />health, and promote efficient management of water and wastewater resources. <br />Docusign Envelope ID: FEFC9AF2-1478-4B9F-806B-DF97B62C9BB3
The URL can be used to link to this page
Your browser does not support the video tag.