My WebLink
|
Help
|
About
|
Sign Out
Planning Commission Agenda Packet 02252026
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2026
>
02-25
>
Planning Commission Agenda Packet 02252026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 3:39:16 PM
Creation date
2/24/2026 3:38:14 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/25/2026
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
P25-0671 and -0672, 1252 Quarry Lane, Suite A Planning Commission <br />7 of 8 <br /> <br />Design Review <br />Architecture, Colors, and Materials <br />Staff believes the proposed exterior building improvements, as shown in Exhibit B, to be minor, <br />well-integrated, and consistent with the existing architectural character of the structure and the <br />surrounding Business Park. The proposed colors and materials are complementary to the <br />existing palette and finishes and do not introduce highly contrasting or visually dominant <br />elements. The design maintains the established building form, proportions, and façade rhythm <br />while providing modest visual enhancement and modernization. Overall, the exterior <br />improvements are commensurate with the quality and scale of nearby development s and <br />would enhance the site's visual character without creating incompatibilities. <br /> <br />Tree Removal and Landscaping <br />A total of 36 trees—35 on site and one off site—representing 13 species, were evaluated as <br />part of the project’s arborist report assessment. Overall tree health on the site is moderate, <br />with approximately 86 percent of the tree population rated in fair condition and none rated in <br />excellent condition. No trees were identified in optimal health, and several exhibit structural or <br />age-related limitations that reduce long-term viability or tolerance to construction impacts. <br /> <br />Thirteen trees are proposed for removal due to direct conflicts with the proposed site <br />improvements, including the parking lot reconfiguration, entry and patio construction, grading, <br />and hardscape and landscape renovation. Several of the affected trees are located entirely <br />within proposed construction footprints where grading, excavation, and soil compaction would <br />exceed acceptable tree preservation tolerances. Additional trees proposed for removal exhibit <br />structural defects, advanced age, or declining conditions that limit their suitability for long-term <br />preservation, even in the absence of proposed project construction. <br /> <br />The remaining 22 trees are proposed for retention. While many are in fair condition and include <br />mature specimens with structural characteristics such as trunk lean or codominant branching, <br />the applicant’s arborist has identified comprehensive tree-protection measures to reduce <br />construction-related impacts. These measures include installing protective fencing within the <br />tree protection zone (TPZ), trunk wrapping, selective pruning for equipment clearance, <br />coordinating staging and material storage outside TPZs, and on-site monitoring during grading <br />(as part of parking lot improvements) and construction. Implementation of these measures is <br />intended to preserve tree health and stability and maintain the environmental and aesthetic <br />benefits of the existing canopy. <br /> <br />As mitigation for the 13 trees to be removed, the applicant proposes installing 13 replacement <br />trees and new complementary landscaping throughout the site. The replacement planting plan <br />introduces species diversity, updates aging or declining vegetation, and enhances visual <br />screening, shade coverage, and overall site aesthetics. The proposed landscape <br />improvements are expected to offset canopy loss over time while improving long-term tree <br />health, spacing, and compatibility with site circulation and building improvements. <br /> <br />Based on the arborist’s evaluation, the limited number of removals tied directly to unavoidable <br />construction conflicts or declining tree conditions, the incorporation of robust tree -protection <br />measures for retained trees, and the one -for-one replacement tree program with additional site <br />landscaping, staff finds the proposed approach balanced and appropriate. The project is <br />expected to maintain and ultimately enhance the site’s landscape character, environmental
The URL can be used to link to this page
Your browser does not support the video tag.