Laserfiche WebLink
P25-0671 and -0672, 1252 Quarry Lane, Suite A Planning Commission <br />3 of 8 <br />side and one on the south side (shared with the adjacent property). There are approximately <br />35 existing trees on site, varying in size, species, and condition. Please refer to Figure 2 for full <br />site details. <br /> <br />Figure 2: Aerial Photo of the Subject Site <br /> <br /> <br />PROPOSED PROJECT <br />The proposed religious facility would serve as a meeting place for Harvest Valley Church <br />congregants and would operate daily, Monday through Sunday, with the largest gatherings <br />occurring on weekends, primarily Sundays. <br /> <br />The proposed weekly schedule and maximum occupancy are as follows: <br /> <br />• Weekday Small Groups: Monday through Friday, 6 p.m. to 9 p.m.; five to 10 staff <br />members and up to 50 congregants <br />• Occasional Saturday Events (e.g., weddings, receptions, community gatherings): <br />Saturdays, 8 a.m. to 2 p.m.; five to 10 staff members and up to 100 congregants <br />• Sunday Worship: Sundays, 7 a.m. to 2 p.m.; five to 10 staff members and up to 200 <br />congregants on site for each service <br /> <br />Associated site improvements are also proposed, including new pavement to add parking <br />spaces on the west side of the building, a patio on the east side, new on-site pedestrian <br />walkways, the removal of 13 existing trees, and new landscaping. <br /> <br />Proposed exterior and interior improvements to the existing building include new light-brown <br />stucco finishes on all elevations, installation of a steel pergola along the north and east sides,