My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR MEETING AGENDA PACKET 3-17-26 (3)
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
031726 REGULAR
>
CITY COUNCIL REGULAR MEETING AGENDA PACKET 3-17-26 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2026 2:57:48 PM
Creation date
3/11/2026 2:56:07 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/17/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
242
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 3 <br />DISCUSSION <br />An ADA Self-Evaluation and Transition Plan (ASETP) is required for public entities with 50 or <br />more employees to evaluate current services, policies, and facilities and to identify and <br />schedule the actions needed to achieve program accessibility. The ASETP serves as a <br />practical guide for identifying and correcting physical and policy barriers that could prevent <br />individuals with disabilities from accessing City programs, services, and facilities, and for <br />demonstrating continued compliance with applicable federal requirements. <br /> <br />The ASETP will document barriers, establish priorities, and provide an implementation <br />approach—including planning-level cost estimates and phasing considerations—to guide <br />removal of identified barriers for community members with disabilities. The review will evaluate <br />accessibility associated with City programs, policies, and services; City facilities; parks; parking <br />lots; and the public right-of-way (including streets, intersections, sidewalks, and access <br />ramps). The effort is anticipated to include evaluation of approximately 69 buildings (including <br />public spaces, restrooms, and paths of travel), 360 miles of sidewalks, 1,850 curb ramps, 266 <br />bus stops, and 125 signalized intersections. Work elements include field surveys and site <br />assessments, as well as public outreach to solicit community input. <br /> <br />The work is anticipated to take approximately one year and will be documented in three <br />deliverables: the ADA Self-Evaluation and Transition Plan, the Public Right-of-Way Asset <br />Survey Report, and the Facilities Survey Report. The resulting data will support the City’s <br />Facility Master Plan, and updated condition information will be incorporated into the City’s <br />Asset Management Program to inform future capital planning and implementation efforts. <br /> <br />REQUEST FOR PROPOSALS <br />City staff issued a qualifications-based Request for Proposals (RFP) and received two <br />proposals on December 23, 2025. Both firms were well-qualified and demonstrated extensive <br />experience in this specialized practice area. Given the limited number of firms that specialize in <br />comprehensive ADA Self-Evaluation and Transition Plan updates and large-scale public right- <br />of-way accessibility field assessments, the level of response was consistent with expectations. <br />A third prospective proposer was invited but ultimately declined to submit due to staffing <br />limitations. <br /> <br />Based on evaluations of the written proposals, interviews, and reference checks, staff <br />recommends awarding a Professional Services Agreement to Bureau Veritas Technical <br />Assessments LLC in an amount not to exceed $435,276. <br /> <br />EQUITY AND SUSTAINABILITY <br />An ADA Self-Evaluation and Transition Plan advances the City of Pleasanton’s equity and <br />sustainability goals by systematically identifying and prioritizing removal of barriers that limit <br />access to City facilities, programs, and the public right-of-way—improving mobility and safety <br />for residents and visitors with disabilities, seniors, and others who rely on accessible walking, <br />rolling, and transit connections. By integrating ADA upgrades into the Capital Improvement <br />Program and routine maintenance (e.g., curb ramps, sidewalks, crossings, and signals), the <br />City can deliver improvements more efficiently, reduce rework and long-term costs, and ensure <br />that Complete Streets, climate, and resilience projects maintain continuous accessible routes. <br />Overall, the Transition Plan provides a transparent, measurable framework for equitable <br />investment and durable infrastructure that supports inclusive access and reduced reliance on <br />Page 107 of 242
The URL can be used to link to this page
Your browser does not support the video tag.