Laserfiche WebLink
FY 2025/26 and 2026/27 Project Prioritization List <br />No. Prioritization <br />Category Project Name Lead Resources Project Description (Low/High) Dept <br />2 -Committed <br />36 Priority LPFD Strategic Planning Update Strategic Plan for FY26-FY31. Update with significant input from LPFD's Community Risk Assessment (CRA). LPFD Low <br />2 -Committed LPFD/County Ambulance/Emergency Alameda County has authority over EMS transport in Pleasanton and intends to make significant changes to the current model <br />37 Priority Medical Service (EMS) Delivery Model that will include changes that impact the LPFD requiring implementation. LPFD High <br />2 -Committed <br />38 Priority Electrical Fleet Replacement Programs This is a state mandated program. By January 1, 2027, 100% of all City vehicle purchases must be zero-emissions. PW High <br />This state mandated program required by the Americans with Disabilities Act (ADA) that outlines how a public entity make <br />2 -Committed Americans with Disabilities Act (ADA) facilities and programs accessible to people with disabilities. It details the process of identifying barriers to accessibility and <br />39 Priority Transition Plan developing a plan to remove those barriers. PW Low <br />Non-functional Turf Ban This project aims to assist private property owners to comply with this regulation by converting non-functional turf to mulch or <br />2 -Committed Implementation and Non-functional drought-tolerant plantings. Convert 2.4 acres of non-functional turf across 11 locations within the City to mulch or drought- <br />40 Priority Turf Conversion tolerant plantings. PW Low <br />This state-mandated program sets long-term water efficiency goals to promote sustainable water use across communities. It <br />2 -Committed State Water Regulations/Conservation supports ongoing conservation practices to help California adapt to water challenges and reduce reliance on emergency drought <br />41 Priority as a Way of Life measures. PW Low <br />2 -Committed This project will develop a management plan in December 2026, that includes short and long-term recommended projects, <br />42 Priority Storm Water Master Plan programs, and actions to ensure the storm drain system continues to meet desired service levels. PW Low <br />2 -Committed This is a comprehensive plan that evaluate option for future space planning, as well as siting and feasibility analysis associated <br />43 Priority Facilities Master Plan with certain major facilities needed for City operations. PW Low <br />Comprehensive Facility and <br />2 -Committed Infrastructure Upgrades -Energy Plan an engery upgrade to facilities and infrastructure to achieve long-term cost savings, reduce greenhouse gas emissions, <br />44 Priority Upgrades increase facility resilience and upgrade/modernize facilities and replace assets at end of life. PW Low <br />3 -Strategic The Pleasanton Community Academy is a free 6 month program that educates residents about City operations and services <br />45 Pipeline Pleasanton Community Academy (PCA) across all departments. PCA has been in operation for two years and has graduated over 50 community members. CMO High <br />3 -Strategic Climate Action Plan (CAP) 2.0 Implementation to include supporting facility upgrades, fleet electrification, and EV charger installation. Launch a Sustainability <br />46 Pipeline Implementation Awards program and update the Municipal Code to require bicycle amenities for certain new developments. CEDD High <br />3 -Strategic Evaluate the feasibility and requirements for establishing a Railroad Quiet Zone in Pleasanton, including all four of the City's at- <br />47 Pipeline Analyze Railroad Quiet Zone grade rail crossings. CEDD Low <br />3 -Strategic <br />48 Pipeline Affordable Housing Project Program Advance a program to develop City-supported affordable housing. CEDD High <br />Adopt a process to evaluate discretionary requests for residential re-zoning/up-zoning and develop structured menu of <br />3 -Strategic community benefits available in exchange for discretionary land use modification/upzoning, to replace negotiated benefits <br />49 Pipeline Community Benefit Program approach. CEDD High <br />3 -Strategic <br />50 Pipeline General Plan Update A comprehensively update the 2005 General Plan. CEDD High <br />Page 18 of 32