My WebLink
|
Help
|
About
|
Sign Out
DHR CONSTRUCTION, INC. (#2026469)
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
D
>
DHR CONSTRUCTION, INC. (#2026469)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2026 11:32:53 AM
Creation date
3/27/2026 11:29:23 AM
Metadata
Fields
Template:
CONTRACTS
Description Type
Landscape Maintenance
Contract Type
New
NAME
DHR CONSTRUCTION, INC.
Contract Record Series
704-05
Munis Contract #
2026469
Contract Expiration
12/31/2026
NOTES
GOLF COURSE TEE RENOVATION AND EXPANSION TO THE CALLIPPE PRESERVE GOLF COURSE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br /> <br />10 Blue Recondition existing tee up to 1,300 SF. <br />10 White Recondition existing tee up to 1,425 SF. <br />12 Black Recondition existing tee up to 814 SF. <br />12 Blue Recondition existing tee up to 1,464 SF. <br />12 Blue Recondition existing tee up to 1,573 SF. <br />17 Black Recondition existing tee up to 974 SF. <br />17 White & Blue Recondition existing tee up to 3,426 SF. <br />17 Yellow Recondition existing tee up to 978 SF. <br /> <br />Project totals are estimated at 15,050 square feet of tee reconditioning, 2,250 square feet of tree <br />expansion (#9 white tee), and 17,300 square feet of sod. <br /> <br />City Project Manager - Project Manager will be the Callippe Preserve Golf Course <br />Superintendent. <br /> <br />Hours of Services - will be determined by the project manager. <br /> <br />Materials - Contractor shall furnish, as part of this agreement, all necessary personnel, supplies, <br />and materials needed for the completion of the identified project. Contractor will be responsible <br />for removing and disposing of concrete debris. <br /> <br />Equipment and Tools - Contractor is responsible for supplying all necessary equipment and <br />tools to perform the project as outlined, whether owned or rented from a third-party agency <br /> <br />Supervision - At all times, the contractor shall provide qualified supervision of each crew and <br />inspection of work while working under this contract to ensure that each requirement of these <br />specifications is consistently met. <br /> <br />Communication - A supervisor/foreman representing the contractor shall be readily available to <br />meet with the Project Manager or Designee as needed for the purposes of correcting problems, <br />conflicts, and coordinating work schedules. <br /> <br />Inspection - Inspection by Project Manager or Designee shall be made during normal City <br />operating hours unless otherwise arranged. <br /> <br />Satisfaction - The progress and standard of quality of work to be accomplished shall be to the <br />degree reasonably acceptable to the Project Manager. In the event the Project Manager or his <br />designee determines the contractor's work is unsatisfactory, the contractor will be required to <br />perform the additional work at no cost to the City. <br /> <br />Damages - All damages to private fencing, homes, backyard items, or ruts left by equipment <br />shall be reported by the Contractor to the City and will be repaired or replaced by the Contractor <br />at no additional cost. <br /> <br />Safety - All OSHA Safety Requirements must be adhered to by the Contractor and/or any <br />subcontractors while on-site. <br />EXHIBIT A <br />Docusign Envelope ID: B9618565-BBBC-47CC-A1B3-5212ACCDFCAD
The URL can be used to link to this page
Your browser does not support the video tag.