Laserfiche WebLink
EXHIBIT A – SCOPE OF WORK <br /> <br />Callippe Preserve Golf Course Cart Path Repairs <br />Background: <br />The Callippe Preserve Golf Course is one of the top municipal golf courses in the region. The <br />course in southern Pleasanton, owned by the city and managed by CourseCo, opened to golfers <br />Nov. 11, 2005. Designed by Brian Costello, Callippe Preserve has earned various awards and <br />accolades over the past 20 years, including: <br />x Sixth-ranked public access golf course by Golf Week Magazine (March 2006). <br />x No. 9 “Best New Public Course Under $75” by Golf Digest (January 2007). <br />x Three-time winner of the GreensKeeper.org “Best Value Award” in the East Bay. <br />x Golf Week Magazine’s 47th “Best Municipal Course” (May 2010). <br />x Six Environmental in Golf Awards (ELGAs). <br /> <br />Scope of Work <br />Furnish all necessary labor, materials, and equipment to complete the following work: <br /> <br />Cart Path Hole 15: <br />Remove and replace approximately 768 square feet of concrete cart path (approximately 96 ft x 8 <br />ft). Dimensions to be confirmed by the contractor. <br /> <br />Cart Path Hole 18: <br />Remove and replace approximately 360 square feet of concrete cart path (approximately 45 ft x 8 <br />ft). Dimensions to be confirmed by the contractor. <br /> <br />Work to include: <br />x Saw cutting and slurry control <br />x Demo and haul off of concrete <br />x Root pruning if required. Roots to be cleanly cut using a saw. <br />x Heavy broom finish to match <br />x Concrete thickness to match existing cart path thickness. <br />x Concrete mixture and work shall adhere to the City of Pleasanton Standard Specifications <br />and Details, July 2024, Section 15. Concrete Improvements. See <br />https://www.cityofpleasantonca.gov/assets/our-government/public- <br />works/engineering/standard-details-2024.pdf for specifications. <br /> <br />City Project Manager - Project Manager will be the Callippe Preserve Golf Course <br />Superintendent. <br /> <br />Hours of Services - will be determined by the project manager. <br /> <br />Materials - Contractor shall furnish, as part of this agreement, all necessary personnel, supplies, <br />and materials needed for the completion of the identified project. Contractor will be responsible <br />for removing and disposing of concrete debris. <br />Docusign Envelope ID: 88204588-341C-47A0-BDCB-1B8798D93C5C