Laserfiche WebLink
2 <br /> <br /> <br />Equipment and Tools - Contractor is responsible for supplying all necessary equipment and <br />tools to perform the project as outlined, whether owned or rented from a third-party agency <br /> <br />Supervision - At all times, the contractor shall provide qualified supervision of each crew and <br />inspection of work while working under this contract to ensure that each requirement of these <br />specifications is consistently met. <br /> <br />Communication - A supervisor/foreman representing the contractor shall be readily available to <br />meet with the Project Manager or Designee as needed for the purposes of correcting problems, <br />conflicts, and coordinating work schedules. <br /> <br />Inspection - Inspection by Project Manager or Designee shall be made during normal City <br />operating hours unless otherwise arranged. <br /> <br />Satisfaction - The progress and standard of quality of work to be accomplished shall be to the <br />degree reasonably acceptable to the Project Manager. In the event the Project Manager or his <br />designee determines the contractor's work is unsatisfactory, the contractor will be required to <br />perform the additional work at no cost to the City. <br /> <br />Damages - All damages to private fencing, homes, backyard items, or ruts left by equipment <br />shall be reported by the Contractor to the City and will be repaired or replaced by the Contractor <br />at no additional cost. <br /> <br />Safety - All OSHA Safety Requirements must be adhered to by the Contractor and/or any <br />subcontractors while on-site. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Docusign Envelope ID: 88204588-341C-47A0-BDCB-1B8798D93C5C