My WebLink
|
Help
|
About
|
Sign Out
CAROLLO ENGINEERS, INC. 3RD AMENDMENT (#2022494)
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
C
>
CAROLLO ENGINEERS, INC. 3RD AMENDMENT (#2022494)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2026 4:17:13 PM
Creation date
3/27/2026 3:32:39 PM
Metadata
Fields
Template:
CONTRACTS
Description Type
Professional Services
Contract Type
Amendment
NAME
CAROLLO ENGINEEERS, INC. (3RD AMENDMENT)
Contract Record Series
704-05
Munis Contract #
2022494
Contract Expiration
12/31/2026
NOTES
WATER SYSTEM MANAGEMENT PLAN
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PAGE Ͳ of ͳ <br />term financial planning including future water rate and connection fee studies. The results of above activities <br />will be documented in this chapter of the WSMP. <br />Task 11 – Resources <br />In this chapter of the WSMP, Carollo will review and summarize current City resources to support the water <br />system program. For staffing, Carollo will summarize the number of full‐time equivalent employees (FTEs) <br />included in the current water budget from both the Utilities Division and other supporting Divisions (e.g., <br />finance, IT/GIS, Eng, etc.). A summary of the roles and responsibilities of the personnel classification will be <br />provided including a functional organizational chart specific to the water program. Carollo will also provide a <br />summary of other resources included in the current water budget including vehicles/equipment, software, <br />and contract help. Through this review and summary, Carollo will flag any noticeable resource gaps such as <br />functional responsibilities with no current assigned resource. However, it is not envisioned that an in‐depth, <br />formal resource evaluation will be conducted as part of this agreement, but instead will be conducted by the <br />City at a later time and in combination with sewer program planning efforts. The results of above activities <br />will be documented in this chapter of the WSMP. <br />Task 12 – Financing <br />In this chapter of the WSMP, Carollo will review and summarize the City’s financing structure (i.e., funding <br />sources/accounts) and current short‐term and long‐term financing plans to support the water system <br />program as documented in the City’s latest CIP and Operational Budgets and Water Rate and Connection <br />Fee studies. <br />As part of their review and summary, Carollo will flag any noticeable financial planning gaps and make <br />recommendations on how the City can improve their financial planning practices to be consistent with <br />industry best practices. It is not the intent for Carollo to perform formal financial evaluations (i.e. water rate <br />studies, connection fee studies, etc.) as part of this agreement, but instead will be conducted by the City at a <br />later time. <br />The results of above activities will be documented in this chapter of the WSMP. <br />Task 13 – Summary of Recommendations <br />In this chapter of the WSMP, Carollo will prepare a summary table that summarizes all recommended <br />actions, programs, and projects to be implemented. The table shall be organized to include <br />recommendation name and description, program goal(s) it is addressing, program element(s) it falls under, <br />estimated implementation cost and funding source(s), and schedule (short‐term or long‐term with actual <br />fiscal years for short‐term items). <br />Prior to inclusion into the Draft WSMP, Carollo shall conduct a workshop to review preliminary <br />recommendations and seek feedback from the City. <br />Task 13 ‐ Deliverables: <br />- Recommendations Workshop Agenda/Presentation <br />Task 14 – Optional Services <br />This task includes an allowance for optional services related to preparation of the initial WSMP (pending <br />completion of Phase ͮ work plan) and/or implementing high priority recommendations resulting from the <br />initial WSMP. Prior to performing services under this task, Carollo shall receive written authorization from <br />the City’s Project Manager. <br />Docusign Envelope ID: 271FE856-C5AE-4E67-BBDD-ED81F3311151
The URL can be used to link to this page
Your browser does not support the video tag.