Laserfiche WebLink
PAGE ͱ of ͳ <br />of improvements such as missing or poorly implemented operational practices/programs. Short‐term <br />implementation will also be coordinated with the City’s current available resources and funding. Long‐ <br />term implementation will be utilized to assist the City with long‐term financial planning including future <br />water rate and connection fee studies. Carollo will document findings and recommendations in this <br />chapter of the WSMP. <br />The City has already identified the following O&M improvements, which will be implemented by Carollo as <br />part of this agreement due to their high priority. <br />Standard Operating Procedures <br />As part of this task Carollo and subconsultant DKF will identify job competencies for the City’s water system <br />related job classifications including Utilities Division Manager, Chief Utilities Systems Operator, Laboratory <br />Services Specialist, Utilities Maintenance Supervisor, Utilities Lead Workers, Utilities Systems Operator I <br />and II, and Utilities Maintenance Workers. Based on these job competencies, Carollo and DKF will develop a <br />list of recommended water related SOPs that are prioritized for purposes of implementation. Carollo and <br />DKF shall also develop a SOP template that includes procedures for reviewing, modifying, adding, and <br />deleting SOP content. The format of SOPs shall be electronic interactive photo‐based and tailored specific <br />to City’s needs. SOPs will include a training plan and competency assessment worksheet. SOPs will address <br />relevant AWWA and CDPH guidelines and requirements. SOPs shall be in pdf and electronic format for <br />incorporation into DKF's cloud‐based subscription service to be utilized by the City for storing and viewing <br />sewer system SOPs. <br />For budget purposes, this task does not include preparation of individual SOPs. The City may utilize the <br />allowance in Task ͭͰ for Carollo and DKF to prepare selected SOPs. Task ͭͰ may also be used to prepare <br />emergency response plans for selected water lift stations. <br /> Training Program <br />Utilizing the job competencies identified above, Carollo and DKF will identify a list of recommended water <br />related training modules that are prioritized for purposes of implementation. Carollo and DKF shall also <br />develop a training module template in coordination with the City’s Training and Emergency Services <br />Manager so that the modules can be integrated into the City’s learning management system. <br />For budget purposes, this task does not include preparation of individual training modules. The City may <br />utilize the allowance in Task ͭͰ for Carollo and DKF to prepare selected training modules. <br />Task 9 ‐ Deliverables:   <br />- Recommended SOP List and Template <br />- Recommended Training Module List and Template <br />Task  10 – Capital Improvements  <br />In this chapter of the WSMP, Carollo will recommend prioritized capital improvement projects with <br />estimated implementation costs for each. This list of recommended projects will integrate <br />recommendations from the various planning efforts discussed in Task ʹ. For example, if through various <br />planning documents a facility has separate recommended improvements related to capacity deficiencies, <br />asset renewal and replacement, and regulatory compliance, then these recommendations shall be <br />integrated into a single capital improvement project with a combined and coordinated scope and cost. The <br />prioritized projects will be grouped into short‐term implementation (i.e., within next ͱ years) and long‐term <br />implementation (i.e., ͱ+ years). Short‐term implementation projects will include readily identifiable, high‐ <br />risk areas of improvements, be coordinated with currently available City resources and funding, and be the <br />basis of updates to the City’s CIP. Long‐term implementation will be utilized to assist the City with long‐ <br />Docusign Envelope ID: 271FE856-C5AE-4E67-BBDD-ED81F3311151