My WebLink
|
Help
|
About
|
Sign Out
CAROLLO ENGINEERS, INC. 3RD AMENDMENT (#2022494)
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
C
>
CAROLLO ENGINEERS, INC. 3RD AMENDMENT (#2022494)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2026 4:17:13 PM
Creation date
3/27/2026 3:32:39 PM
Metadata
Fields
Template:
CONTRACTS
Description Type
Professional Services
Contract Type
Amendment
NAME
CAROLLO ENGINEEERS, INC. (3RD AMENDMENT)
Contract Record Series
704-05
Munis Contract #
2022494
Contract Expiration
12/31/2026
NOTES
WATER SYSTEM MANAGEMENT PLAN
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Water System Program <br />Administration Operations & <br />Maintenance <br />(O&M) <br />Capital <br />(Infrastructure) <br />Improvements <br />Resources Financial <br />Oversight <br />‐Goals <br />‐Performance <br />Indicators <br />‐Program <br />Assessment <br />‐Policies <br />‐Legal Authority <br />Stakeholder <br />Coordination <br />‐City Council <br />‐Customers <br />‐Coordinating <br />Agencies <br />Emergency <br />Response <br />‐Main / <br />Service <br />Breaks <br />‐Boil Water <br />Alerts <br />Field Services <br />‐Meter <br />Program <br />‐Customer <br />Service <br />‐USA <br />Location <br />Distribution <br />‐Flushing <br />‐Fire Flow <br />Testing <br />‐Main <br />Chlorination <br />‐Valve Turning <br />‐Maintenance <br />& Repairs <br />Standard <br />Operating <br />Procedures <br />(SOP) <br />Distribution <br />Capacity <br />(Existing/Future) <br />Regulatory <br />Compliance <br />System <br />Optimization & <br />Resiliency <br />Design <br />Standards <br />Personnel Contractors Vehicles and <br />Equipment <br />Software <br />Water <br />Connection <br />Fees / Studies <br />Water Rates / <br />Studies <br />Fund 422 <br />CIP Water <br />Expansion <br />(Growth) <br />Fund 421 <br />CIP Water <br />Repair, <br />Replacement, & <br />Enhancement <br />Fund 420 <br />Operations & <br />Maintenance <br />Fund 424 <br />Water Vehicle <br />and Equipment <br />R&R <br />Water System Management Plan (WSMP) <br />CIP <br />‐Short Term <br />Plan <br />‐Long Term <br />Plan <br />Facilities <br />‐Preventive & <br />Corrective <br />Maintenance <br />‐Condition <br />Assessments <br />Record <br />Information <br />Attachment 1 <br />WATER SYSTEM <br />PROGRAM ELEMENTS <br />Asset Renewal & <br />Replacement <br />Design & <br />Construction of <br />CIP Projects <br />Planning <br />Process <br />‐Process <br />Control <br />‐Water Quality <br />Monitoring / <br />Control <br />‐Chemical <br />Systems <br />Management <br />Water Resources <br />‐Supply vs. <br />Demand <br />‐Conservation <br />Development <br />Projects <br />Resource <br />Evaluation <br />Workforce <br />Development <br />System <br />(Training) <br />Docusign Envelope ID: 271FE856-C5AE-4E67-BBDD-ED81F3311151
The URL can be used to link to this page
Your browser does not support the video tag.