Laserfiche WebLink
<br />City of Pleasanton 4 Woodard & Curran, Inc. <br />Advanced Planning Projects – Sewer Infrastructure Impact December 11, 2025 <br /> <br /> <br />Sincerely, <br />WOODARD & CURRAN, INC. <br /> Chris van Lienden <br />Project Manager <br />Task Total <br />G <br />i <br />s <br />Chris <br />van <br />Lienden <br />Senior <br />Tech. <br />Review <br />Nathan <br />Hanson <br />Staff <br />Engineer <br />Admin. <br />Support <br />S <br />D SPM STL PE2 E1 PA <br /> $ 370 $ 375 $ 315 $ 225 $ 145 <br />Task 1 - Project Administration and Coordination <br />1.1 Project Administration and Coordination 8 6 14 $3,830 $3,830 <br />Subtotal Task 1:8 0 0 0 6 14 $ 3,830 $ 3,830 <br />Task 2 - Create Model Loading Scenarios <br />2.1 Model Load Scenarios - Projects 1 and 2 4 8 16 28 $7,600 $7,600 <br />2.2 Model Load Scenarios - Projects 1, 2 and 3 4 8 16 28 $7,600 $7,600 <br />Subtotal Task 2:8 0 16 32 0 56 $ 15,200 $ 15,200 <br />Task 3 - Evaluate Adequacy of Sewer System <br />3.1 Sewer System Evaluation - Projects 1 and 2 8 2 12 20 42 $11,990 $11,990 <br />3.2 Sewer System Evaluation - Project 3 8 2 12 20 42 $11,990 $11,990 <br />Subtotal Task 3:16 4 24 40 0 84 $ 23,980 $ 23,980 <br />Task 4 - Technical Memorandums <br />4.1 Technical Memorandum - Project 1 & 2 4 10 16 30 $8,230 $8,230 <br />4.2 Technical Memorandum - Project 3 4 10 16 30 $8,230 $8,230 <br />Subtotal Task 4:8 0 20 32 0 60 $ 16,460 $ 16,460 <br />TOTAL:40 4 60 104 6 214 $ 59,470 $ 59,470 <br />1. Labor costs include salaries, overhead, and profit based on W&C's standard hourly rate schedule at the time the work is conducted. <br />Woodard & Curran Labor W&C Costs <br />Total <br />Estimated <br />Fee <br />Total <br />W&C <br />Hours <br />W&C <br />Labor <br />Costs (1) <br />Docusign Envelope ID: FD04895D-67BA-4A01-A55C-FDF87B5399C5Docusign Envelope ID: ECB15ECD-7A1F-4E85-B7A9-398949919095