My WebLink
|
Help
|
About
|
Sign Out
WOODARD & CURRAN (#2026440)
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
W
>
WOODARD & CURRAN (#2026440)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2026 9:39:12 AM
Creation date
4/3/2026 9:37:19 AM
Metadata
Fields
Template:
CONTRACTS
Description Type
Professional Services
Contract Type
New
NAME
WOODARD & CURRAN
Contract Record Series
704-05
Munis Contract #
2026440
Contract Expiration
1/31/2027
NOTES
CONSULTANT PROVIDING HYDRAULIC MODELING SUPPORT AND EVALUATION OF SEWER INFRASTRUCTURE.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Pleasanton 3 Woodard & Curran, Inc. <br />Advanced Planning Projects – Sewer Infrastructure Impact December 11, 2025 <br />Subtask 3.2 <br />This subtask includes model runs for Project 3’s upper and lower density scenarios as defined <br />in Subtask 1.2. These scenarios will use the scenarios from subtask 2.1 as baseline sewer loads. <br />If a capacity project is identified under this subtask, the number of units required to “trigger” a <br />capacity project will be determined, and a planning-level cost estimate developed. This task <br />also includes one (1) coordination meeting with City staff to discuss findings. <br />Task 4 – Advanced Planning Project Evaluation Technical Memorandums <br />Woodard & Curran will summarize the model results and scenario development in two brief <br />Technical Memorandums (TM) for review by the City. The TM will document the model updates <br />and assumptions made for the evaluation and include model hydraulic profile plots of the flow <br />in the relevant downstream sewers. <br />Subtask 4.1 <br />This subtask includes the TM development for Projects 1 and 2 including both lower and upper <br />density scenarios for Project 2. <br />Subtask 4.2 <br />This subtask includes the TM development for Project 3 including both lower and upper density <br />scenarios. <br />Deliverables: <br />• Draft and final summary TMs <br />Estimated Cost <br />The estimated level of effort and cost for completing the scope of services described above is <br />$59,470 as detailed in the table below. <br />Docusign Envelope ID: FD04895D-67BA-4A01-A55C-FDF87B5399C5Docusign Envelope ID: ECB15ECD-7A1F-4E85-B7A9-398949919095
The URL can be used to link to this page
Your browser does not support the video tag.