My WebLink
|
Help
|
About
|
Sign Out
PC-2026-07
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2020 - PRESENT
>
2026
>
PC-2026-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2026 9:23:51 AM
Creation date
4/13/2026 9:23:00 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
3/25/2026
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Wireless Telecommunications Facilities Policy (City of Pleasanton) page 12 / 37 <br />notice to the applicant, the requesting party or appellant, and persons entitled to <br />notice; and (2) publish notice in at least one newspaper of general circulation within <br />the City or post notice in at least three public places in the City including one public <br />place in the area directly affected by the proceeding . The public hearing notice <br />shall include the project location, a general project description, and the date, time <br />and location for the public hearing. Failure to mail notices shall not invalidate the <br />proceedings. <br /> <br />Section 10. APPROVALS; DENIALS; APPEALS <br /> <br />(a) Initial Administrative Decision. The Zoning Administrator may approve, <br />conditionally approve, or deny a complete and duly filed Wireless Facility Permit <br />application administratively if no request for a hearing is timely filed, or at an <br />administrative hearing if a timely request for a hearing is timely filed. If the Zoning <br />Administrator refers an application for a Wireless Facility Permit to the Planning <br />Commission, the Planning Commission may approve, conditionally approve, or <br />deny a complete and duly filed Wireless Facility Permit application at a public <br />hearing. <br /> <br />(b) Required Findings for Approval. The approval authority may approve wireless <br />communication facility applications only when the approval authority makes all the <br />following findings: <br /> <br />(1) the proposed wireless facility is in a preferred location as defined in this policy; <br />or the proposed wireless facility is in a discouraged location as defined in this <br />policy and the applicant has demonstrated through a meaningful comparative <br />analysis that no more preferred location would be technically feasible and <br />potentially available; <br /> <br />(2) the proposed wireless facility is on a preferred support structure as defined in <br />this policy; or the proposed wireless facility is on a discouraged support <br />structure as defined in this policy and the applicant has demonstrated through <br />a meaningful comparative analysis that no more preferred support structure <br />would be technically feasible and potentially available; <br /> <br />(3) the proposed wireless facility complies with all applicable development <br />standards in this policy, the Municipal Code and any other applicable <br />regulations; <br /> <br />(4) the applicant has demonstrated that the proposed wireless facility will comply <br />with all applicable FCC regulations and guidelines for human exposure to RF <br />emissions and will not, either individually or cumulatively with other transmitters <br />in the vicinity, result in RF exposures that exceed the FCC’s maximum <br />permissible exposure level for the general population; <br /> <br />(5) all public notices required for the application have been given; and <br />Docusign Envelope ID: 51CE5BDE-55F1-4B3D-8865-17E5814CF0C5
The URL can be used to link to this page
Your browser does not support the video tag.