My WebLink
|
Help
|
About
|
Sign Out
PC-2026-07
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2020 - PRESENT
>
2026
>
PC-2026-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2026 9:23:51 AM
Creation date
4/13/2026 9:23:00 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
3/25/2026
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Wireless Telecommunications Facilities Policy (City of Pleasanton) page 23 / 37 <br />extend this term limit unless expressly provided otherwise in such permit or <br />approval or required under federal or state law. This permit shall run with the <br />land and shall be valid for the term specified in these conditions of approval. <br />No change in ownership of the wireless facility, the site, or the subject property <br />shall affect the permit term. This permit may not be transferred to another site <br />or property. <br /> <br />(2) Permit Renewal. The permittee may apply for permit renewal not more than <br />one year before this permit expires. The permittee must demonstrate that the <br />subject wireless facility has complied with all the conditions of approval <br />associated with this permit and will comply with all applicable provisions in this <br />policy and the Municipal Code that exist at the time the decision to renew or <br />not renew is rendered. The Director may modify or amend the conditions on a <br />case-by-case basis as may be necessary or appropriate to ensure compliance <br />with this policy, the Municipal Code or other applicable laws. Upon renewal, <br />this permit will automatically expire 10 years and one day from its issuance. <br /> <br />(3) City’s Standing Reserved. The City’s grant or grant by operation of law of a <br />permit pursuant to this policy does not waive, and shall not be construed to <br />waive, any standing by the City to challenge any (A) provision in federal or state <br />law or any interpretation thereof or (B) permit issued pursuant to this policy. <br /> <br />(4) Compliance with Approved Plans. Before the permittee submits any <br />applications to the building official required to commence construction in <br />connection with this permit, the permittee must incorporate this permit, all <br />conditions associated with this permit, any approved photo simulations, and <br />any approved RF emissions report into the project plans (the “Approved <br />Plans”). The permittee must construct, install and operate the wireless facility <br />in strict compliance, as determined by the approval authority, with the Approved <br />Plans. Any alterations, modifications or other changes to the Approved Plans, <br />whether requested by the permittee or required by other departments or public <br />agencies with jurisdiction over the wireless facility, must be submitted in a <br />written request subject to the Director’s prior review and approval. After the <br />Director receives a written request to approve an alteration, modification or <br />other change to the Approved Plans, the Director may refer the request to the <br />original approval authority if the Director finds that it substantially deviates from <br />the Approved Plans or implicates a significant or substantial land-use concern. <br /> <br />(5) CPUC GO-159A Certification. Within 15 business days after the City’s grant <br />of this permit or any permit is deemed granted or deemed approved by the <br />operation of law, the permittee shall serve copies of California Public Utility <br />Commission notification letters required by CPUC General Order No. 159A to <br />the City Clerk, Director and City Manager. <br /> <br />(6) Build-Out Period. This permit will automatically expire 12 months from the <br />approval date or deemed granted or deemed approved date (the “Build-Out <br />Docusign Envelope ID: 51CE5BDE-55F1-4B3D-8865-17E5814CF0C5
The URL can be used to link to this page
Your browser does not support the video tag.