<br />Wireless Telecommunications Facilities Policy (City of Pleasanton) page 24 / 37 <br />Period”) unless the permittee obtains all other permits and approvals required <br />to install, construct and/or operate the approved wireless facility, which includes <br />without limitation any permits or approvals required by any federal, state or <br />local public agencies with jurisdiction over the subject property, support <br />structure or the wireless facility and/or its use. The permittee may request in <br />writing, and the Director may grant in writing, one 12-month extension to the <br />Build-Out Period if the permittee submits, at least 30 days prior to the automatic <br />expiration date in this condition, substantial and reliable written evidence <br />demonstrating justifiable cause for the 12-month extension submitted. If the <br />Build-Out Period (and any extension) finally expires, this permit shall be <br />automatically void but the permittee may resubmit a complete application, <br />which includes without limitation all application fees, for the same or a <br />substantially similar project. <br /> <br />(7) Pre-Installation Requirements. In addition to obtaining all other permits and <br />approvals required to install, construct and/or operate the approved wireless <br />facility, which includes without limitation any permits or approvals required by <br />any federal, state or local public agencies with j urisdiction over the subject <br />property, the wireless facility or its use, the permittee shall, prior to <br />commencement of any installation or construction, attend a pre -grading <br />meeting with the Public Works Department regarding temporary Best <br />Management Practices (“BMPs”) pertaining to discharges from the <br />construction site. Before the permittee can proceed with installation or <br />construction of the approved wireless facility, the Public Works Department <br />must inspect and approve the permittee’s installation of such temporary BMPs. <br /> <br />(8) Post-Installation Certification. Within 60 calendar days after the permittee <br />commences full, unattended operations at the wireless facility, the permittee <br />shall provide the Director with documentation reasonably acceptable to the <br />Director that the wireless facility has been installed and/or constructed in strict <br />compliance with the Approved Plans. Such documentation shall include, <br />without limitation, electronic as-built drawings prepared by a California licensed <br />civil engineer, GIS data, site photographs, and an affirmation, signed by a <br />California licensed RF engineer, that the installation as constructed and <br />operated complies with the RF emissions report and any mitigation measures <br />therein made part of the Approved Plans, as well as all applicable FCC rules <br />and regulations for human exposure to RF emissions and will not cause <br />members of the general public to be exposed to RF levels that exceed the <br />maximum permission exposure levels deemed safe by the FCC. In a written <br />notice to the permittee, the Director may (but shall not have the obligation to) <br />certify that the wireless facility complies with the Approved Plans or order the <br />permittee to correct any noncompliance. <br /> <br />(9) Site Maintenance. The permittee shall keep the site, which includes without <br />limitation any and all improvements, equipment, structures, access routes, <br />fences, hardscape and landscape features, in a neat, clean, safe and code <br />Docusign Envelope ID: 51CE5BDE-55F1-4B3D-8865-17E5814CF0C5