Laserfiche WebLink
EVALUATION OF GROUNDWATER SUPPLY ALTERNATIVES WITHIN BERNAL SUBBASIN <br />APRIL 2026 / FINAL / CAROLLO <br />CITY OF PLEASANTON 5 <br /> <br />Figure 2 Proposed Location of Turnout 8 <br />As discussed during a coordination meeting with the City and Carollo on February 9, 2026, provisions for a <br />future booster pump station should be provided adjacent to the turnout and fluoridation facilities in the <br />event it is needed in the future due to Zone 7 lowering pressure delivery to all turnouts. These provisions <br />include space for the pump station to be installed, upsizing of nearby electrical services, and stub outs <br />downstream of the turnout vault so the booster pump station can easily connect to the City’s distribution <br />system. Given the close proximity to residential properties, a masonry wall and a landscape buffer is <br />envisioned to be provided on the eastern side of the site to minimize community impacts. Since the