My WebLink
|
Help
|
About
|
Sign Out
Evaluation of Groundwater Supply Alternatives Within Bernal Subbasin
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
042126 REGULAR
>
Evaluation of Groundwater Supply Alternatives Within Bernal Subbasin
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2026 10:07:54 AM
Creation date
4/14/2026 9:55:49 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/21/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
582
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REGIONAL GROUNDWATER FACILITIES PROJECT <br />FEASIBILITY STUDY <br /> <br /> 26 Zone 7 Water Agency <br />December, 2025 <br /> <br />Notably, the first two criteria, Water Production Capacity and Groundwater Basin Sustainability, are not <br />included in the scoring framework because they function as pass/fail requirements. While only Project <br />Alternatives 2 and 4 satisfy Zone 7’s 7,000 AFY production threshold, all four project alternatives are <br />carried forward into the scoring process for informational and comparison purposes. Scoring definitions <br />were tailored to each of the six weighted categories to ensure transparency and repeatability. Table 7 <br />summarizes the scoring framework for these six categories. <br />Table 7. Evaluation Category Scoring Criteria <br />Project Alternative <br />Evaluation Category 1 – 3 4 – 7 8 – 10 <br />Community & <br />Environmental Impacts <br />Excessive community or <br />environmental impacts <br />(e.g., high visibility, long- <br />term disruption to parks) <br />Moderate impacts <br />with manageable <br />mitigation <br />Low impacts; <br />minimal disruption to <br />community spaces <br />Capital Cost Highest capital cost <br />relative to other <br />alternatives <br />Moderate capital cost Lowest capital cost <br />relative to other <br />alternatives <br />Water <br />Quality/Treatment <br />Impacts <br />High risk of treatment <br />requirements or long- <br />term water quality <br />concerns <br />Moderate treatment <br />requirements or risk <br />Minimal treatment <br />needs; strong long- <br />term water quality <br />outlook <br />Implementation <br />Schedule <br />Long duration to <br />implement; significant <br />permitting or <br />construction delays <br />expected <br />Moderate timeline; <br />some delays but <br />manageable <br />Shorter timeline; few <br />constraints <br />Operational Flexibility <br />& Resilience <br />Poor to marginal <br />flexibility; limited <br />redundancy; major <br />operational constraints <br />Adequate flexibility; at <br />least one redundant <br />source with some <br />constraints <br />High flexibility; <br />multiple redundant <br />sources with minimal <br />constraints <br />Operations & <br />Maintenance Cost <br />High O&M cost relative <br />to other alternatives <br />Moderate O&M cost Low O&M cost <br />relative to other <br />alternatives <br /> <br />4.1.4. Ranking Methodology <br />Each project alternative was first screened against the two pass/fail requirements: water production <br />capacity and groundwater basin sustainability. While only Alternatives 2 and 4 satisfy Zone 7’s 7,000 AFY <br />production target, all four alternatives were considered in this Study. <br />Alternatives passing the initial screen were then scored against the six weighted criteria described in <br />Section 4.1.1. Scores were assigned on a 1–10 scale in accordance with the definitions in Section 4.1.3 and
The URL can be used to link to this page
Your browser does not support the video tag.