My WebLink
|
Help
|
About
|
Sign Out
Evaluation of Groundwater Supply Alternatives Within Bernal Subbasin
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
042126 REGULAR
>
Evaluation of Groundwater Supply Alternatives Within Bernal Subbasin
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2026 10:07:54 AM
Creation date
4/14/2026 9:55:49 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/21/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
582
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iii Client Name <br />Month Year <br />TABLE OF CONTENTS <br />LIST OF ACRONYMS AND ABBREVIATIONS <br />Acronym Meaning <br />°C degree Celsius <br />°F degree Fahrenheit <br />CCR California Code of Regulations <br />City City of Pleasanton <br />Cm Centimeter <br />COC Chain of custody <br />DO dissolved oxygen <br />EPA Environmental Protection Agency <br />Kg Kilogram <br />Lbs Pounds <br />ml milliliter <br />Mpa Megapascal <br />OD Outside Diameter <br />ORP oxygen reduction potential <br />Plan Testing, Sampling, and Analysis Plan <br />PSI Pounds per Square Inch <br />QA quality assurance <br />QC quality control <br />Scope Regional Groundwater Facilities Project Feasibility Study <br />SP specific conductance <br />spinner spinner flowmeter <br />SVOC semi volatile organic compound <br />Ttemperature <br />T Time <br />Zone 7 Zone 7 Water Agency <br />ʅŵ micrometer
The URL can be used to link to this page
Your browser does not support the video tag.