Testing, Sampling, and Analysis Plan <br />January 15, 2025 <br />1 <br />Zone 7 Water Agency and <br />City of Pleasanton <br />1. INTRODUCTION AND PURPOSE <br />This Testing, Sampling, and Analysis Plan (plan) was prepared to satisfy Task 2 of the scope of work <br />described in the Regional Groundwater Facilities Project Feasibility Study (Scope) for the Zone 7 Water <br />Agency (Zone 7) and the City of Pleasanton (City), dated September 17, 2024. This Plan details the <br />procedures, methods, timelines, analytes, test methods, sample control, chain of custody forms and <br />documentation, and turnaround times for the sampling that will be completed on the newly constructed <br />test wells that will be constructed under Task 1 of the Scope. Each well will be pump tested to assess well <br />performance, subject to spinner analysis to characterize zonal flow within the well, and collection of zonal <br />and composite water samples for analysis. <br />Groundwater sampling activities will include Title 22 drinking water analysis as described in the California <br />Code of Regulations (CCRs). Constituents, laboratory analytical methods, and practical quantitation limits <br />are summarized in Attachments 1 and 2. <br />The purpose of this Plan is to provide guidance to qualified professional personnel engaging in the <br />collection of well performance data and analysis of groundwater quality data. Use of this Plan intends to <br />promote the collection of high-quality data, thereby supporting data usability. Testing and sampling <br />procedures and protocols outlined herein are in accordance with pertinent current Environmental <br />Protection Agency (EPA) Standard Methods, California Code of Regulations Title 22, and current industry <br />standards and practices. <br />2. WELL AND AQUIFER TESTING <br />After final development and when the well meets the specified performance requirements, tests will be <br />performed. The first test will be an 8-hour step pumping test to determine the target design capacity of <br />the well. The second test will be an 8-hour constant rate pumping test at the final design capacity as <br />determined by the Engineer based upon evaluation of well performance during the step test. The test <br />capacities will be determined by the Engineer before or during the testing based upon the results of <br />development and test pumping. Well and aquifer testing shall not exceed 20 hours without written <br />direction from the Engineer/Owner. <br />2.1. Well and Aquifer Testing Procedures <br />A. Static Water Level <br />a. At the start of each day of pumping, the Contractor shall record the static water level in <br />the well (see Section 5.1). At all other times, the static water level shall be considered to <br />be attained when three successive water level measurements spaced ten minutes apart <br />show no appreciable change. <br />B. Flow Metering <br />a. During each test or step, the discharge of the pump shall be measured with an accurate, <br />calibrated totalizing and instantaneous flow meter, or other type as approved by the <br />Engineer. The pump discharge rate shall be maintained at all times during the test within