My WebLink
|
Help
|
About
|
Sign Out
Evaluation of Groundwater Supply Alternatives Within Bernal Subbasin
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
042126 REGULAR
>
Evaluation of Groundwater Supply Alternatives Within Bernal Subbasin
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2026 10:07:54 AM
Creation date
4/14/2026 9:55:49 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/21/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
582
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Testing, Sampling, and Analysis Plan <br />January 15, 2025 <br />2 <br />Zone 7 Water Agency and <br />City of Pleasanton <br />plus or minus 5 percent of the pump test rate by means of an approved gate valve in <br />concert with engine speed. <br />b. Throughout the test, the Contractor shall frequently record flow rate and totalizer <br />readings to ensure that the pumping rate remains constant. <br />C. Measurements <br />a. The Contractor shall measure the depth to water to the nearest 0.01 feet, flow rate, and <br />sand content at the time intervals specified herein. <br />b. Each well test shall be monitored by the Contractor with data recorded according to the <br />following applicable time schedules: <br />i. Turn the pump on to the approved test pumping capacity at time (t) = 0. <br />ii. The contractor shall measure and record the depth to water as follows: <br />1. each minute, from t = 1 to t = 10. <br />2. each 2 minutes, from t = 10 to t = 20. <br />3. each 5 minutes from t = 20 to t = 50. <br />4. each 10 minutes from t = 50 to t = 100. <br />5. at t = 120, t = 150, t = 180, t = 240, and t = 300. <br />6. each 100 minutes after t = 300. <br />c. Each recovery test shall be recorded according to the following applicable schedule: <br />i. The contractor shall measure the depth to water and record as follows (t' refers <br />to time since pump shut off): <br />1. each minute, t' = 1 to t' = 10 <br />2. each 2 minutes, t' = 10 to t' = 20 <br />3. each 5 minutes, t' = 20 to t' = 50 <br />4. each 10 minutes, t' = 50 to t' = 100 <br />5. at t' = 120, t' = 150, t' = 180, t' = 240, t' = 300 <br />D. Pump Failure <br />a. In the case of failure or interruption of the pump operation for a period greater than one <br />(1) percent of the elapsed pumping time from t = 0, the test shall be suspended until the <br />static water level has been attained. Should the test be aborted as a result of a deficiency <br />on the part of the Contractor's equipment or personnel, all time consumed in waiting for <br />complete water level recovery and in resuming the pump test to the point where it was <br />aborted shall be at no cost to the Owner. <br />E. Completion <br />a. After the well testing has been completed, the record of water level measurements shall <br />be delivered to the Engineer on the forms provided as part of these documents. The test <br />pump shall not be removed from the well until the Engineer has evaluated the data and <br />authorized its removal.
The URL can be used to link to this page
Your browser does not support the video tag.