My WebLink
|
Help
|
About
|
Sign Out
Evaluation of Groundwater Supply Alternatives Within Bernal Subbasin
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
042126 REGULAR
>
Evaluation of Groundwater Supply Alternatives Within Bernal Subbasin
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2026 10:07:54 AM
Creation date
4/14/2026 9:55:49 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/21/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
582
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Testing, Sampling, and Analysis Plan <br />January 15, 2025 <br />4 <br />Zone 7 Water Agency and <br />City of Pleasanton <br />E. Casing/borehole size <br />F. Surface elevation (if available) <br />G. Services requested (logs run) <br />H. Perforated intervals <br />I. Pump depth <br />J. Pump rate <br />K. Drill depth or completed depth <br />L. Logging depth <br />3.4. Logging Order <br />The spinner/flowmeter is normally run prior to the depth-specific sampling program. The spinner log will <br />help determine where the samples will be collected based on the well-bore flow profile. <br />3.5. Calibration <br />The spinner log will be run at multiple tool velocities to develop a slope and ensure repeatability of the <br />fluid velocities within the well-bore. <br />Basically, there are three types of tool calibration standards: <br />1. Primary calibration standards involve permanent test pits, which are primarily used to calibrate <br />logging tool prototypes and shop standards. <br />2. Secondary or shop calibration standards are transportable calibration standards that are referenced <br />to the primary standards. Shop standards are often too bulky to be easily transported to field sites. <br />Logging sondes should be checked against these standards on a monthly basis. <br />3. Tertiary or field standards are compact enough that they can easily be taken to the field to verify that <br />the sondes calibration has not drifted from the shop calibration at each logging job. <br />3.6. Standard Procedure for Logging Operation <br />Pacific Surveys logging equipment is fixed and mounted within a vehicle. It consists of a winch that spools <br />the wireline, a data processing system that powers up and processes the data, and a computer that <br />collects and plots the data. <br />3.6.1. Pacific Surveys Logging Procedures consist of the following steps: <br />1. Parking and securing the logging vehicle at the well/borehole. <br />2. Rigging up, consisting of hanging a sheave wheel or using a boom to support the wireline during <br />logging operations. <br />3. Rigging up the sondes and centering them within the well/borehole. <br />4. Powering up the sonde and checking the acquisition system’s outputs for correct voltage, tool current <br />and applicable tool measurements. <br />5. Zeroing the tool to the log datum (i.e., ground surface, top of casing).
The URL can be used to link to this page
Your browser does not support the video tag.