My WebLink
|
Help
|
About
|
Sign Out
Evaluation of Groundwater Supply Alternatives Within Bernal Subbasin
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
042126 REGULAR
>
Evaluation of Groundwater Supply Alternatives Within Bernal Subbasin
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2026 10:07:54 AM
Creation date
4/14/2026 9:55:49 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/21/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
582
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVALUATION OF GROUNDWATER SUPPLY ALTERNATIVES WITHIN BERNAL SUBBASIN <br />APRIL 2026 / FINAL / CAROLLO <br />CITY OF PLEASANTON 16 <br /> Reliability factors include delivery during drought conditions, redundancy for short-term facility <br />outages (planned and unplanned), ability to mitigate impacts of emergency outages occurring at the <br />regional supply level, and risk of low supply pressures from Zone 7 at turnouts. <br /> Alternatives with a higher level of reliability are considered more favorable. <br />The weight of this criterion is 5 (25 percent). <br />5.1.2 Water Quality Reliability <br />This criterion considers the following: <br /> The alternative's ability to deliver water quality at or better than regulatory requirements. <br /> The alternative's flexibility in source blending (i.e. groundwater vs. surface water) and locational <br />delivery to aid in the City's management of water quality within the distribution season based on <br />seasonal changes. <br /> Alternatives with a higher level of reliability are considered more favorable. <br />The weight of this criterion is 5 (25 percent). <br />5.1.3 Ease of Expansion for Treatment <br />This criterion considers the following: <br /> The ease of expanding new groundwater facilities for the purposes of additional treatment if required <br />to meet future groundwater regulations. <br /> The availability of space, ease of permitting, ability to operate, and cost risk. <br /> Alternatives with a simpler ease of expansion are considered more favorable. <br />The weight of this criterion is 3 (15 percent). <br />5.1.4 Community and Environmental Impact <br />This criterion considers the following: <br /> Short-term impacts from construction and long-term impacts from operation of groundwater supply <br />and City distribution facilities. <br /> Community and environmental impact categories include aesthetics, air quality, hazard materials, <br />noise, traffic, and recreational use. <br /> Alternatives that minimize these impacts are considered more favorable. <br />The weight of this criterion is 4 (20 percent).
The URL can be used to link to this page
Your browser does not support the video tag.