EVALUATION OF GROUNDWATER SUPPLY ALTERNATIVES WITHIN BERNAL SUBBASIN <br />APRIL 2026 / FINAL / CAROLLO <br />CITY OF PLEASANTON 20 <br />Table 8 Alternative Evaluation with Weighting <br />Alternative <br />Water Supply Reliability Water Quality Reliability Ease of Expansion for Treatment Community and Environmental Impacts Implementation Schedule <br />Total <br />Score <br />Ability to deliver the <br />City's annual GPQ <br />(3,500 AFY) and assist <br />in meeting max day <br />demands by providing <br />max day supply of 4,400 <br />gpm for both existing <br />and future conditions. <br />Provide reliable water <br />supply delivery during <br />drought conditions, <br />redundancy for short- <br />term facility outages <br />(planned and <br />unplanned), ability to <br />mitigate impacts of <br />emergency outages <br />occurring at the regional <br />supply level, and reduce <br />risk of low supply <br />pressures at turnouts <br />Ability to deliver water <br />quality at or below <br />current regulatory <br />requirements <br />Flexibility in source <br />blending and locational <br />delivery to aid in the <br />City's management of <br />water quality within the <br />distribution season <br />based on seasonal <br />changes. <br />Feasibility to expand new <br />groundwater facilities for <br />the purposes of <br />additional treatment if <br />required to meet future <br />groundwater regulations <br />Availability of space, <br />ease to permit, ability to <br />operate, and cost risk. <br />Short-term impacts from <br />construction activities. <br />Impact categories <br />include aesthetics, air <br />quality, hazard materials, <br />noise, traffic, and <br />recreational use. <br />Long-term impacts from <br />new facilities park users, <br />nearby residents, and <br />the environment. Impact <br />categories include <br />aesthetics, air quality, <br />hazard materials, noise, <br />traffic, and recreational <br />use. <br />The anticipated time <br />from project approval to <br />water production. This <br />includes pre-design, <br />design, construction and <br />corresponding permitting <br />where applicable to each <br />alternative. <br />Potential for delays in <br />implementation schedule <br />and impacts to City. <br />Criteria <br />Weighting 5 5 3 4 3 <br /> <br />Score Rationale Score Rationale Score Rationale Score Rationale Score Rationale Score Rationale Score Rationale Score Rationale Score Rationale Score Rationale <br />Alternative 1 - <br />Continue <br />Purchase Water <br />from Zone 7 <br />2 Zone 7 has only <br />committed to <br />offset City GPQ <br />via the delivery <br />request process <br />for the next 5 <br />years. They <br />have indicated <br />they cannot <br />commit to these <br />deliveries for <br />future conditions. <br />1 Does not <br />improve any of <br />the four <br />reliability <br />criteria. <br />5 Can meet <br />current water <br />quality <br />regulations. <br />2 Maintains current <br />status where City <br />has no <br />contractual <br />control over <br />source blends <br />and Zone 7’s <br />ability to adjust <br />source blends <br />are impacted by <br />regional <br />considerations. <br />5 Treatment <br />expansion under <br />this alternative <br />occurs at the <br />regional level. <br />5 Provides lowest <br />risk since Zone <br />7 has multiple <br />regional <br />facilities and <br />options to <br />expand <br />treatment to <br />meet future <br />regulatory <br />requirements. <br />4 Project requires <br />no construction <br />of groundwater <br />supply <br />improvements at <br />parks. It does <br />require <br />construction of <br />City distribution <br />improvements <br />primarily in <br />public right of <br />way with <br />moderate <br />impacts requiring <br />mitigation <br />measures. <br />4 Project requires <br />no new <br />permanent <br />facilities in parks. <br />Project does <br />require new <br />turnout facility <br />building (with <br />chemical <br />storage) on City <br />owned parcel <br />with moderate <br />impacts. <br />3 Implementation <br />schedule for City <br />distribution <br />improvements is <br />approximately 3 <br />years. <br />4 City distribution <br />improvements <br />represent <br />moderate <br />potential for <br />delay (i.e. <br />traditional right- <br />of-way <br />construction <br />risks and turnout <br />permitting with <br />Zone 7 that is <br />partially out of <br />City’s control). <br />Impacts of delay <br />to City are low <br />as delay does <br />not change cost <br />of supply from <br />Zone 7 and <br />distribution <br />improvements <br />are primarily <br />needed for <br />future conditions <br />so there is <br />schedule float. <br />66.5