Laserfiche WebLink
EVALUATION OF GROUNDWATER SUPPLY ALTERNATIVES WITHIN BERNAL SUBBASIN <br />APRIL 2026 / FINAL / CAROLLO <br />CITY OF PLEASANTON 23 <br />5.3 50-Year Life Cycle Cost Comparison <br />5.3.1 Cost Estimates <br />Capital and annual costs were estimated at a conceptual level to allow comparison of each alternative. The <br />following subsections summarize capital costs, annual O&M costs, and total annual costs. All cost <br />estimates presented have been escalated to reflect January 2026 dollars. <br />5.3.2 Capital Costs <br />The project alternatives are at the preliminary engineering phase with limited design information. A <br />feasibility-level project cost estimate for each alternative was prepared in accordance with the Association <br />for the Advancement of Cost Engineering Class 5 standards. Class 5 estimates are adequate for <br />determining feasibility and the comparison and selection of alternatives. <br />The Class 5 estimates include the following four components: <br /> Total Direct Cost - Includes all costs associated with labor, materials, and equipment necessary for <br />the construction of the facilities. <br /> Total Estimated Construction Cost – In addition to total direct cost, includes construction costs that <br />are not readily seen in the end product, such as general conditions, sales tax, construction <br />contingency, and contractor overhead and profit, and change order allowance. <br /> Total Estimated Project Cost – In addition to total estimated construction cost, includes design, <br />permitting, legal, and administrative costs. Includes costs for construction support with construction <br />management and engineering services during construction. <br />Alternative 1 includes no capital costs for groundwater supply improvements. It does include capital costs <br />for a new turnout from Zone 7’s transmission system, including fluoridation facilities at the turnout, and <br />improvements to the City’s distribution system as described in Section 2. Refer to Appendix B for details <br />on the cost estimate for the turnout and fluoridation facilities and Appendix A for details on the cost <br />estimate for the City distribution improvements. The total estimated capital cost for Alternative 1 is <br />summarized in Table 9. <br />Table 9 Alternative 1 - Summary of Total Estimated Capital Cost <br />Capital Improvement Category Estimated Capital Cost ($)(1) <br />City Distribution 12,290,000 <br />Groundwater Supply(2) 0 <br />Total 12,290,000 <br />Notes: <br />(1) Values are rounded to the nearest ten thousandth place. <br />(2) This alternative does not include groundwater supply capital improvement costs because GPQ is purchased from Zone 7 as <br />described in Section 2.3. <br />Alternative 2 requires the same turnout and City distribution improvements and costs as Alternative 1. <br />Alternative 2 also includes new joint groundwater supply improvements with Zone 7 and the costs <br />developed in the Regional Groundwater Facilities Project Feasibility Study (see Appendix E) were used for