My WebLink
|
Help
|
About
|
Sign Out
Evaluation of Groundwater Supply Alternatives Within Bernal Subbasin
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
042126 REGULAR
>
Evaluation of Groundwater Supply Alternatives Within Bernal Subbasin
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2026 10:07:54 AM
Creation date
4/14/2026 9:55:49 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/21/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
582
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 1 Turnout Flows for Existing Maximum Day Demand Alternatives <br />Groundwater Supply Alternative Evaluation <br />City of Pleasanton <br />PRELIMINARY <br />Fill <br />(Max Flow)Drain Average <br />(psi)(psi)(gpm)(gpm)(gpm) <br />Alternative 1a - Existing Demands with 100% Zone 7 Purchases (26.8 mgd) <br />TO 1 Lower 52-86 psi 93 psi 2,200 1,800 2,029 Operating TO1 helps balance Foothill and <br />Sycamore Tank Levels <br />TO 2 Lower 59-89 psi Avg. 58 psi <br />46-68 psi 0 0 0 Zone 7 pressures too low to operate <br />TO 3 Lower 51-86 psi Avg. 123 psi <br />88-149 psi 2,000 1,000 1,571 <br />TO 4 <br />Lower <br />(To be boosted <br />when required) <br />60-89 psi Avg. 97 psi <br />75-145 psi 5,200 3,800 4,600 Booster Station at TO4 Planned <br />TO 5 Lower 47-84 psi Avg. 117 psi <br />50-160 psi 5,500 4,500 5,071 <br />TO 6 Bonde <br />(Boosted)82-94 psi 2,420 0 1,485 <br />TO 7 Ruby Hill Upper <br />(Boosted)128 - 157 psi 1,740 0 905 <br />TO 8 <br />(Proposed)Lower 44-82 psi 3,600 2,600 3,171 Proposed Turnout near Vineyard and Bernal <br />Fill <br />(Max Flow)Drain Average <br />(psi)(psi)(gpm)(gpm)(gpm) <br />Alternative 1b - Existing Demands with 2 New City Wells (26.8 mgd) <br />TO 1 Lower 53-81 psi 93 psi 2,000 1,000 1,571 Operating TO1 helps balance Foothill and <br />Sycamore Tank Levels <br />TO 2 Lower 63-88 psi Avg. 58 psi <br />46-68 psi 0 0 0 Zone 7 pressures too low to operate <br />TO 3 Lower 53-81 psi Avg. 123 psi <br />88-149 psi 1,500 1,500 1,500 <br />TO 4 <br />Lower <br />(To be boosted <br />when required) <br />61-87 psi Avg. 97 psi <br />75-145 psi 4,500 2,400 3,600 Booster Station at TO4 Planned <br />TO 5 Lower 46-75 psi Avg. 117 <br />50-160 psi 5,500 4,000 4,857 <br />TO 6 Bonde <br />(Boosted)82-93 psi 2,420 0 1,515 <br />TO 7 Ruby Hill Upper <br />(Boosted)128 - 155 psi 1,740 0 905 <br />Tennis Park <br />Well Lower 63-89 psi -2,500 <br />Hansen Park <br />Well Lower 64-90 psi -2,500 <br />10/6/2025 <br />Supply ID Destination Zone Pleasanton <br />Pressures <br />Zone 7 <br />Historical <br />Pressures <br />Turnout Flow <br />Comments <br />2,500 <br />2,500 <br />CommentsSupply ID Destination Zone Pleasanton <br />Pressures <br />Zone 7 <br />Historical <br />Pressures <br />Turnout Flow <br />Docusign Envelope ID: A2CEC78C-F0FD-4D4D-9F39-237EDFC2492E
The URL can be used to link to this page
Your browser does not support the video tag.