My WebLink
|
Help
|
About
|
Sign Out
Evaluation of Groundwater Supply Alternatives Within Bernal Subbasin
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
042126 REGULAR
>
Evaluation of Groundwater Supply Alternatives Within Bernal Subbasin
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2026 10:07:54 AM
Creation date
4/14/2026 9:55:49 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/21/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
582
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 2 Turnout Flows for Buildout Maximum Day Demand Alternatives <br />Groundwater Supply Alternative Evaluation <br />City of Pleasanton <br />PRELIMINARY <br />Fill <br />(Max Flow)Drain Average <br />(psi)(psi)(gpm)(gpm)(gpm) <br />Alternative 2a - Future Demands with 100% Zone 7 Purchases (32.9 mgd) <br />TO 1 Lower 55-82 psi 93 psi 3,500 2,500 3,071 Operating TO1 helps balance Foothill and <br />Sycamore Tank Levels <br />TO 2 Lower 62-83 psi Avg. 58 psi <br />46-68 psi 0 0 0 Zone 7 pressures too low to operate <br />TO 3 Lower 56-82 psi Avg. 123 psi <br />88-149 psi 2,500 2,500 2,500 <br />TO 4 <br />Lower <br />(To be boosted <br />when required) <br />62-81 psi Avg. 97 psi <br />75-145 psi 5,200 4,300 4,814 Booster Station at TO4 Planned <br />TO 5 Lower 50-78 psi Avg. 117 psi <br />50-160 psi 6,000 5,300 5,700 <br />TO 6 Bonde <br />(Boosted)82-93 psi 2,400 0 1,545 <br />TO 7 Ruby Hill Upper <br />(Boosted)128 - 157 psi 1,740 0 915 <br />TO 8 <br />(Proposed)Lower 47-75 psi 5,000 4,000 4,571 Proposed Turnout near Vineyard and Bernal <br />Fill <br />(Max Flow)Drain Average <br />(psi)(psi)(gpm)(gpm)(gpm) <br />Alternative 2b - Future Demands with 2 New City Wells (32.9 mgd) <br />TO 1 Lower 55-80 psi 93 psi 3,500 2,000 2,857 Operating TO1 helps balance Foothill and <br />Sycamore Tank Levels <br />TO 2 Lower 64-84 psi Avg. 58 psi <br />46-68 psi 0 0 0 Zone 7 pressures too low to operate <br />TO 3 Lower 54-77 psi Avg. 123 psi <br />88-149 psi 1,500 1,500 1,500 <br />TO 4 <br />Lower <br />(To be boosted <br />when required) <br />64-81 psi Avg. 97 psi <br />75-145 psi 5,000 4,500 4,786 Booster Station at TO4 Planned <br />TO 5 Lower 48-73 psi Avg. 117 psi <br />50-160 psi 7,000 5,500 6,357 <br />TO 6 Bonde <br />(Boosted)82-93 psi 2,400 0 1,530 <br />TO 7 Ruby Hill Upper <br />(Boosted)128 - 155 psi 1,740 0 915 <br />Tennis Park <br />Well Lower 65-85 psi -2,500 <br />Hansen Park <br />Well Lower 65-86 psi -2,500 <br />10/6/2025 <br />2,500 <br />2,500 <br />Supply ID Destination Zone Pleasanton <br />Pressures <br />Zone 7 <br />Historical <br />Pressures <br />Turnout Flow <br />Comments <br />Supply ID Destination Zone Pleasanton <br />Pressures <br />Zone 7 <br />Historical <br />Pressures <br />Turnout Flow <br />Comments <br />Docusign Envelope ID: A2CEC78C-F0FD-4D4D-9F39-237EDFC2492E
The URL can be used to link to this page
Your browser does not support the video tag.