Laserfiche WebLink
EVALUATION OF GROUNDWATER SUPPLY ALTERNATIVES WITHIN BERNAL SUBBASIN <br />APRIL 2026 / FINAL / CAROLLO <br />CITY OF PLEASANTON iii <br />Abbreviations <br />AFY acre-feet per year <br />Akel Akel Engineering Group, Inc. <br />Carollo Carollo Engineers <br />City City of Pleasanton <br />EUAC equivalent uniform annual cost <br />gpm gallons per minute <br />GPQ groundwater production quota <br />lf linear feet <br />LSCE Luhdorff & Scalmanini Consulting Engineers <br />O&M operations and maintenance <br />PFAS per- and polyfluoroalkyl substances <br />PG&E Pacific Gas and Electric <br />residential planned unit development with residential design <br />Zone 7 Zone 7 Water Agency <br />